Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Fresh and frozen food packaging
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 180,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,001,880 12,682,000 kWh $0.08
Electricity Demand $160,740 30,276 kW-months/year $5.31
Electricity Fees $500 - $ -
Natural Gas $479,470 58,094 MMBtu $8.25
TOTAL ENERGY COSTS $1,642,590
RECOMMENDED SAVINGS* $28,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,760
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,600
Cost:
$59,000
- - $18,600 3,355 - - - - -
-
kWh
$18,600
3,355
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,600
Cost:
$2,440
- - - - $3,600 342 - - -
-
kWh
-
-
kW-months/year
$3,600
342
MMBtu
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,665
Cost:
-
$2,360 27,800 $305 55 - - - - $2,360
27,800
kWh
$305
55
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,170
Cost:
$640
$380 4,450 $35 6 - - $755 - $380
4,450
kWh
$35
6
kW-months/year
-
-
MMBtu
$755
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,160
Cost:
$150
$960 11,265 $200 36 - - - - $960
11,265
kWh
$200
36
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,150
Cost:
$15
$1,020 12,010 $130 24 - - - - $1,020
12,010
kWh
$130
24
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,345
Cost:
$62,245
$4,720 55,525 $19,270 3,476 $3,600 342 $755 - $4,720
55,525
kWh
$19,270
3,476
kW-months/year
$3,600
342
MMBtu
$755
-
$
TOTAL IMPLEMENTED Savings:
$19,760
Cost:
$59,150
$960 11,265 $18,800 3,391 - - - - $960
11,265
kWh
$18,800
3,391
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost