IAC Assessment: AM0519
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0519
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Enclosed steel trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3799 - Transportation Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 63,000
Annual Production 3,100 Pieces
Production Hrs. Annual 2,146
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,552 619,947 kWh $0.09
Electricity Demand $23,806 3,060 kW-months/year $7.78
Electricity Fees $2,243 - $ -
Natural Gas $26,175 2,386 MMBtu $10.97
TOTAL ENERGY COSTS $107,776
RECOMMENDED SAVINGS* $21,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,100
Cost:
$15,300
$5,160 40,600 $1,800 227 - - - - $140 - - - $5,160
40,600
kWh
$1,800
227
kW-months/year
-
-
$
-
-
$
$140
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,890
Cost:
$500
$2,900 22,800 $990 127 - - - - - - - - $2,900
22,800
kWh
$990
127
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,500
Cost:
$3,000
- - - - $1,500 - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
$1,500
-
$
-
-
$
-
-
$
$6,000
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$770
Cost:
$14
$570 4,500 $200 25 - - - - - - - - $570
4,500
kWh
$200
25
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$900
Cost:
$1,500
- - $1,360 10,700 - - $(-460) - - - - - -
-
kWh
$1,360
10,700
kW-months/year
-
-
$
$(-460)
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$575
Cost:
$1,000
$425 3,350 $150 19 - - - - - - - - $425
3,350
kWh
$150
19
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
$250
$330 2,600 $120 15 - - - - - - - - $330
2,600
kWh
$120
15
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$280
Cost:
-
- - - - $280 - - - - - - - -
-
kWh
-
-
kW-months/year
$280
-
$
-
-
$
-
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$145
Cost:
-
$145 1,140 - - - - - - - - - - $145
1,140
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$130
Cost:
-
$130 1,060 - - - - - - - - - - $130
1,060
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,740
Cost:
$21,564
$9,660 76,050 $4,620 11,113 $1,780 - $(-460) - $140 - $6,000 - $9,660
76,050
kWh
$4,620
11,113
kW-months/year
$1,780
-
$
$(-460)
-
$
$140
-
$
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$19,220
Cost:
$19,050
$8,390 66,000 $2,910 369 $1,780 - - - $140 - $6,000 - $8,390
66,000
kWh
$2,910
369
kW-months/year
$1,780
-
$
-
-
$
$140
-
$
$6,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost