IAC logo
IAC Assessment: AM0544
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0544
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2008
Principal Product Envelopes
NAICS 322230 - Stationery Product Manufacturing
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 114,702
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 8,496
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $653,326 8,466,418 kWh $0.08
Electricity Demand $113,500 16,629 kW-months/year $6.83
Electricity Fees $12,050 - $ -
TOTAL ENERGY COSTS $778,876
RECOMMENDED SAVINGS* $90,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $90,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,200
Cost:
$42,370
$24,050 316,400 $3,150 456 - - - - - - $24,050
316,400
kWh
$3,150
456
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$26,350
Cost:
$2,500
$23,300 306,600 $3,050 442 - - - - - - $23,300
306,600
kWh
$3,050
442
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$16,810
Cost:
-
$14,140 186,100 $2,670 387 - - - - - - $14,140
186,100
kWh
$2,670
387
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,200
Cost:
$24,000
$10,200 134,000 - - - - - - - - $10,200
134,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$6,800
Cost:
-
- - - - $6,800 - - - - - -
-
kWh
-
-
kW-months/year
$6,800
-
$
-
-
$
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,885
Cost:
-
$1,670 21,915 $215 31 - - - - - - $1,670
21,915
kWh
$215
31
kW-months/year
-
-
$
-
-
$
-
-
$
07: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$1,040
Cost:
-
- - - - - - - - $1,040 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,040
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$385
Cost:
-
$75 980 $5 1 - - $305 - - - $75
980
kWh
$5
1
kW-months/year
-
-
$
$305
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$90,670
Cost:
$68,870
$73,435 965,995 $9,090 1,317 $6,800 - $305 - $1,040 - $73,435
965,995
kWh
$9,090
1,317
kW-months/year
$6,800
-
$
$305
-
$
$1,040
-
$
TOTAL IMPLEMENTED Savings:
$90,670
Cost:
$68,870
$73,435 965,995 $9,090 1,317 $6,800 - $305 - $1,040 - $73,435
965,995
kWh
$9,090
1,317
kW-months/year
$6,800
-
$
$305
-
$
$1,040
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost