IAC Assessment: AM0546
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0546
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2008
Principal Product Steel fabrication
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 255,000
Annual Production 13,200 Tons
Production Hrs. Annual 6,384
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,048 2,107,776 kWh $0.08
Electricity Demand $31,362 6,528 kW-months/year $4.80
Electricity Fees $2,659 - $ -
Natural Gas $257,353 30,904 MMBtu $8.33
TOTAL ENERGY COSTS $470,422
RECOMMENDED SAVINGS* $100,807 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$33,360
Cost:
$17,050
- - - - - - $33,360 4,005 - - -
-
kWh
-
-
kW-months/year
-
-
$
$33,360
4,005
MMBtu
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$22,310
Cost:
$8
$31,200 336,000 $170 17 - - - - $(-9,060) - $31,200
336,000
kWh
$170
17
kW-months/year
-
-
$
-
-
MMBtu
$(-9,060)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,520
Cost:
$2,000
$11,250 121,000 $1,270 267 - - - - - - $11,250
121,000
kWh
$1,270
267
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,325
Cost:
$15,150
$9,290 99,820 $1,100 229 - - - - $(-1,065) - $9,290
99,820
kWh
$1,100
229
kW-months/year
-
-
$
-
-
MMBtu
$(-1,065)
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$8,700
Cost:
-
$8,700 93,500 - - - - - - - - $8,700
93,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,070
Cost:
-
$6,520 70,130 $550 116 - - - - - - $6,520
70,130
kWh
$550
116
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,420
Cost:
$7,755
- - $3,420 715 - - - - - - -
-
kWh
$3,420
715
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,447
Cost:
-
- - - - $2,447 - - - - - -
-
kWh
-
-
kW-months/year
$2,447
-
$
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,250
Cost:
$670
$230 2,450 $20 4 - - - - $1,000 - $230
2,450
kWh
$20
4
kW-months/year
-
-
$
-
-
MMBtu
$1,000
-
$
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$405
Cost:
-
$370 3,940 $35 7 - - - - - - $370
3,940
kWh
$35
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$100,807
Cost:
$42,633
$67,560 726,840 $6,565 1,355 $2,447 - $33,360 4,005 $(-9,125) - $67,560
726,840
kWh
$6,565
1,355
kW-months/year
$2,447
-
$
$33,360
4,005
MMBtu
$(-9,125)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes