IAC logo
IAC Assessment: AM0549
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0549
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2008
Principal Product Oil and gas well wellheads and subsea trees
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 462,700
Annual Production 36,000 Tons
Production Hrs. Annual 7,120
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,586,268 18,178,638 kWh $0.09
Electricity Demand $243,525 35,249 kW-months/year $6.91
Electricity Fees $12,859 - $ -
Natural Gas $109,118 12,261 MMBtu $8.90
TOTAL ENERGY COSTS $1,951,770
RECOMMENDED SAVINGS* $176,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$72,200
Cost:
$85,400
$65,700 738,700 $6,500 1,245 $65,700
738,700
kWh
$6,500
1,245
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,300
Cost:
$1,000
$7,550 84,800 $750 143 $7,550
84,800
kWh
$750
143
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$80,000
Cost:
-
$80,000 898,000 - - $80,000
898,000
kWh
-
-
kW-months/year
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$8,050
Cost:
-
$7,270 72,400 $780 149 $7,270
72,400
kWh
$780
149
kW-months/year
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,260
Cost:
$615
$5,260 59,000 - - $5,260
59,000
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,220
Cost:
$1,410
$1,130 12,750 $90 17 $1,130
12,750
kWh
$90
17
kW-months/year
07: 2.7145 INSTALL SKYLIGHTS Savings:
$1,110
Cost:
$1,410
$1,110 12,500 - - $1,110
12,500
kWh
-
-
kW-months/year
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$560
Cost:
-
$510 5,700 $50 10 $510
5,700
kWh
$50
10
kW-months/year
TOTAL RECOMMENDED Savings:
$176,700
Cost:
$89,835
$168,530 1,883,850 $8,170 1,564 $168,530
1,883,850
kWh
$8,170
1,564
kW-months/year
TOTAL IMPLEMENTED Savings:
$95,030
Cost:
$88,425
$86,910 967,650 $8,120 1,554 $86,910
967,650
kWh
$8,120
1,554
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand