IAC Assessment: AM0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2009
Principal Product Screen printed items
NAICS 339950 - Sign Manufacturing
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 205,000
Annual Production 11,000,000 Pieces
Production Hrs. Annual 2,159
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,200 1,987,536 kWh $0.10
Electricity Demand $65,980 8,796 kW-months/year $7.50
Electricity Fees $2,396 - $ -
Natural Gas $42,204 4,494 MMBtu $9.39
TOTAL ENERGY COSTS $303,780
RECOMMENDED SAVINGS* $25,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,542
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$13,545
Cost:
$38,430
$8,455 94,030 $3,090 523 - - $2,000 - $8,455
94,030
kWh
$3,090
523
kW-months/year
-
-
$
$2,000
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,920
Cost:
$680
$3,600 40,120 $1,320 223 - - - - $3,600
40,120
kWh
$1,320
223
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,200
Cost:
$11,050
- - $3,200 540 - - - - -
-
kWh
$3,200
540
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,440
Cost:
$15
$1,050 11,700 $390 65 - - - - $1,050
11,700
kWh
$390
65
kW-months/year
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$705
Cost:
$300
$580 6,450 $125 21 - - - - $580
6,450
kWh
$125
21
kW-months/year
-
-
$
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$452
Cost:
-
- - - - - - $452 - -
-
kWh
-
-
kW-months/year
-
-
$
$452
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,025
Cost:
$535
$265 2,940 $25 4 $735 - - - $265
2,940
kWh
$25
4
kW-months/year
$735
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,287
Cost:
$51,010
$13,950 155,240 $8,150 1,376 $735 - $2,452 - $13,950
155,240
kWh
$8,150
1,376
kW-months/year
$735
-
$
$2,452
-
$
TOTAL IMPLEMENTED Savings:
$8,542
Cost:
$1,530
$5,495 61,210 $1,860 313 $735 - $452 - $5,495
61,210
kWh
$1,860
313
kW-months/year
$735
-
$
$452
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes