IAC logo
IAC Assessment: AM0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2009
Principal Product Countertops
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 70,000
Annual Production 3,850 Thousand Feet
Production Hrs. Annual 2,268
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,045 2,310,376 kWh $0.08
Natural Gas $12,350 1,191 MMBtu $10.37
TOTAL ENERGY COSTS $208,395
RECOMMENDED SAVINGS* $50,875 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,765
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,930
Cost:
$21,500
$18,140 197,200 - - - - $790 - $18,140
197,200
kWh
-
-
$
-
-
$
$790
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,000
Cost:
$25,000
- - - - $15,000 - - - -
-
kWh
-
-
$
$15,000
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,720
Cost:
$1,000
$7,720 83,900 - - - - - - $7,720
83,900
kWh
-
-
$
-
-
$
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$6,040
Cost:
$22,100
$6,040 65,700 - - - - - - $6,040
65,700
kWh
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,070
Cost:
-
- - - - $1,070 - - - -
-
kWh
-
-
$
$1,070
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$715
Cost:
-
$715 7,780 - - - - - - $715
7,780
kWh
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$690
Cost:
$305
$180 1,935 $510 - - - - - $180
1,935
kWh
$510
-
$
-
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$450
Cost:
-
$450 4,910 - - - - - - $450
4,910
kWh
-
-
$
-
-
$
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$260
Cost:
-
$260 2,835 - - - - - - $260
2,835
kWh
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,875
Cost:
$69,905
$33,505 364,260 $510 - $16,070 - $790 - $33,505
364,260
kWh
$510
-
$
$16,070
-
$
$790
-
$
TOTAL IMPLEMENTED Savings:
$43,765
Cost:
$47,805
$27,465 298,560 $510 - $15,000 - $790 - $27,465
298,560
kWh
$510
-
$
$15,000
-
$
$790
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost