IAC Assessment: AM0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2010
Principal Product Crushed limestone
NAICS 327991 - Cut Stone and Stone Product Manufacturing
SIC 3281 - Cut Stone And Stone Products
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 400,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 3,744
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $642,342 16,127,157 kWh $0.04
Electricity Demand $840,066 89,164 kW-months/year $9.42
TOTAL ENERGY COSTS $1,482,408
RECOMMENDED SAVINGS* $98,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,610
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$50,440
Cost:
$125,600
$19,440 486,000 $31,000 3,390 - - - - $19,440
486,000
kWh
$31,000
3,390
kW-months/year
-
-
$
-
-
$
02: 3.2176 INCREASE USE OF AUTOMATION Savings:
$28,100
Cost:
$14,000
- - - - $28,100 - - - -
-
kWh
-
-
kW-months/year
$28,100
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$10,225
Cost:
-
$5,125 128,135 $5,100 558 - - - - $5,125
128,135
kWh
$5,100
558
kW-months/year
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,880
Cost:
-
$1,120 28,100 $2,760 302 - - - - $1,120
28,100
kWh
$2,760
302
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,115
Cost:
$6,560
$1,450 36,300 $1,665 182 - - - - $1,450
36,300
kWh
$1,665
182
kW-months/year
-
-
$
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,680
Cost:
-
- - - - - - $1,680 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,680
-
$
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$880
Cost:
$135
$540 13,440 $340 37 - - - - $540
13,440
kWh
$340
37
kW-months/year
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$610
Cost:
$100
$280 7,100 $330 36 - - - - $280
7,100
kWh
$330
36
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$98,930
Cost:
$146,395
$27,955 699,075 $41,195 4,505 $28,100 - $1,680 - $27,955
699,075
kWh
$41,195
4,505
kW-months/year
$28,100
-
$
$1,680
-
$
TOTAL IMPLEMENTED Savings:
$53,610
Cost:
$125,835
$20,260 506,540 $31,670 3,463 - - $1,680 - $20,260
506,540
kWh
$31,670
3,463
kW-months/year
-
-
$
$1,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes