IAC Assessment: AM0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2010
Principal Product acrylic and polyester resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 36
Plant Area (Sq.Ft.) 650,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,443 5,977,334 kWh $0.04
Electricity Demand $93,475 13,043 kW-months/year $7.17
Electricity Fees $1,466 - $ -
Natural Gas $402,072 85,377 MMBtu $4.71
TOTAL ENERGY COSTS $721,456
RECOMMENDED SAVINGS* $39,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,991
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,000
Cost:
$5,000
- - - - $8,000 1,696 -
-
kWh
-
-
kW-months/year
$8,000
1,696
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,460
Cost:
$21,600
$5,470 144,000 $1,990 272 - - $5,470
144,000
kWh
$1,990
272
kW-months/year
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,760
Cost:
$1,030
- - - - $5,760 1,223 -
-
kWh
-
-
kW-months/year
$5,760
1,223
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,087
Cost:
$21,130
- - $5,087 696 - - -
-
kWh
$5,087
696
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,760
Cost:
$42
$3,130 82,500 $1,630 223 - - $3,130
82,500
kWh
$1,630
223
kW-months/year
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,250
Cost:
$500
- - - - $3,250 696 -
-
kWh
-
-
kW-months/year
$3,250
696
MMBtu
07: 2.7145 INSTALL SKYLIGHTS Savings:
$2,550
Cost:
$2,030
$2,550 67,200 - - - - $2,550
67,200
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,521
Cost:
$560
$980 25,715 $541 74 - - $980
25,715
kWh
$541
74
kW-months/year
-
-
MMBtu
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$980
Cost:
-
$980 25,940 - - - - $980
25,940
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$39,368
Cost:
$51,892
$13,110 345,355 $9,248 1,265 $17,010 3,615 $13,110
345,355
kWh
$9,248
1,265
kW-months/year
$17,010
3,615
MMBtu
TOTAL IMPLEMENTED Savings:
$25,991
Cost:
$28,690
$6,450 169,715 $2,531 346 $17,010 3,615 $6,450
169,715
kWh
$2,531
346
kW-months/year
$17,010
3,615
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas