IAC Assessment: AM0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2011
Principal Product chemicals
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $100,000,000-$500,000,000
# of Employees 110
Plant Area (Sq.Ft.) 150,000
Annual Production 90,000 Thousand Gallons
Production Hrs. Annual 2,510
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,145 2,205,000 kWh $0.06
Electricity Demand $43,166 9,944 kW-months/year $4.34
Electricity Fees $449 - $ -
TOTAL ENERGY COSTS $167,760
RECOMMENDED SAVINGS* $79,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$74,000
Cost:
$26,000
$76,000 1,033,000 $23,000 5,508 $(-25,000) (-3,525) $76,000
1,033,000
kWh
$23,000
5,508
kW-months/year
$(-25,000)
(-3,525)
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,850
Cost:
-
- - $1,850 498 - - -
-
kWh
$1,850
498
kW-months/year
-
-
MMBtu
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,246
Cost:
$180
$1,081 14,610 $165 40 - - $1,081
14,610
kWh
$165
40
kW-months/year
-
-
MMBtu
04: 2.6215 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON Savings:
$1,150
Cost:
-
$910 12,300 $240 59 - - $910
12,300
kWh
$240
59
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$650
Cost:
$270
$650 8,790 - - - - $650
8,790
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$393
Cost:
-
$393 5,300 - - - - $393
5,300
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$79,289
Cost:
$26,450
$79,034 1,074,000 $25,255 6,105 $(-25,000) (-3,525) $79,034
1,074,000
kWh
$25,255
6,105
kW-months/year
$(-25,000)
(-3,525)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,500
Cost:
$270
$650 8,790 $1,850 498 - - $650
8,790
kWh
$1,850
498
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas