IAC logo
IAC Assessment: AM0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product Conveyors
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 200,000
Annual Production 1,600 Pieces
Production Hrs. Annual 4,723
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,172 1,782,951 kWh $0.05
Electricity Demand $40,206 6,336 kW-months/year $6.35
Electricity Fees $2,244 - $ -
Natural Gas $34,046 6,476 MMBtu $5.26
TOTAL ENERGY COSTS $170,668
RECOMMENDED SAVINGS* $65,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,385
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,900
Cost:
$21,800
$21,600 407,600 $7,300 1,035 - - - - - - $21,600
407,600
kWh
$7,300
1,035
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$8,500
Cost:
$2,560
$8,500 161,000 - - - - - - - - $8,500
161,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,515
Cost:
$1,500
$5,780 109,000 $1,735 245 - - - - - - $5,780
109,000
kWh
$1,735
245
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,000
Cost:
$13,190
- - $6,000 848 - - - - - - -
-
kWh
$6,000
848
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$13,000
Cost:
$1,300
- - - - - - $2,600 - $10,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,600
-
$
$10,400
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$715
Cost:
-
$535 10,090 $180 26 - - - - - - $535
10,090
kWh
$180
26
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$485
Cost:
$275
$75 1,450 $15 2 - - $395 - - - $75
1,450
kWh
$15
2
kW-months/year
-
-
$
$395
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$485
Cost:
$275
$75 1,450 $15 2 $395 - - - - - $75
1,450
kWh
$15
2
kW-months/year
$395
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,600
Cost:
$40,900
$36,565 690,590 $15,245 2,158 $395 - $2,995 - $10,400 - $36,565
690,590
kWh
$15,245
2,158
kW-months/year
$395
-
$
$2,995
-
$
$10,400
-
$
TOTAL IMPLEMENTED Savings:
$50,385
Cost:
$25,150
$27,530 519,500 $9,065 1,284 $395 - $2,995 - $10,400 - $27,530
519,500
kWh
$9,065
1,284
kW-months/year
$395
-
$
$2,995
-
$
$10,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost