IAC Assessment: AM0619
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0619
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product Bricks
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 100,000
Annual Production 125,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $633,695 11,266,950 kWh $0.06
Electricity Demand $134,694 31,128 kW-months/year $4.33
Electricity Fees $2,148 - $ -
TOTAL ENERGY COSTS $770,538
RECOMMENDED SAVINGS* $33,129 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,714
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,450
Cost:
$58,400
$14,750 295,000 $3,700 968 - - - - - - $14,750
295,000
kWh
$3,700
968
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$7,470
Cost:
-
$6,550 131,000 $920 236 - - - - - - $6,550
131,000
kWh
$920
236
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,900
Cost:
-
$2,335 46,700 $565 145 - - - - - - $2,335
46,700
kWh
$565
145
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,410
Cost:
$60
$1,080 21,700 $330 86 - - - - - - $1,080
21,700
kWh
$330
86
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,105
Cost:
$512
$155 3,130 $15 4 $935 - - - - - $155
3,130
kWh
$15
4
kW-months/year
$935
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,055
Cost:
$500
$780 15,600 $275 70 - - - - - - $780
15,600
kWh
$275
70
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$402
Cost:
-
- - - - - - $402 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$402
-
$
-
-
$
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$337
Cost:
-
- - - - - - - - $337 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$337
-
$
TOTAL RECOMMENDED Savings:
$33,129
Cost:
$59,472
$25,650 513,130 $5,805 1,509 $935 - $402 - $337 - $25,650
513,130
kWh
$5,805
1,509
kW-months/year
$935
-
$
$402
-
$
$337
-
$
TOTAL IMPLEMENTED Savings:
$27,714
Cost:
$58,900
$22,080 441,600 $4,895 1,274 - - $402 - $337 - $22,080
441,600
kWh
$4,895
1,274
kW-months/year
-
-
$
$402
-
$
$337
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost