IAC Assessment: AM0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product photovoltaic solar cells
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 140,000
Annual Production 35,700 Pieces
Production Hrs. Annual 8,568
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,312 7,531,637 kWh $0.05
Electricity Demand $199,236 14,400 kW-months/year $13.84
Electricity Fees $48,396 - $ -
Natural Gas $28,482 3,579 MMBtu $7.96
TOTAL ENERGY COSTS $726,305
RECOMMENDED SAVINGS* $150,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$75,600
Cost:
$270,000
$46,300 856,800 $16,700 1,200 - - - - $12,600 - - - $46,300
856,800
kWh
$16,700
1,200
kW-months/year
-
-
MMBtu
-
-
Tgal
$12,600
-
$
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,800
Cost:
$13,240
$10,900 201,650 $10,900 786 - - - - - - - - $10,900
201,650
kWh
$10,900
786
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$36,640
Cost:
$10,000
$11,800 217,900 $4,240 305 $20,600 3,100 - - - - - - $11,800
217,900
kWh
$4,240
305
kW-months/year
$20,600
3,100
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,838
Cost:
$500
$2,430 44,960 $408 29 - - - - - - - - $2,430
44,960
kWh
$408
29
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,538
Cost:
$1,045
$1,130 21,000 $408 29 - - - - - - - - $1,130
21,000
kWh
$408
29
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,500
Cost:
$8,160
- - $4,500 326 - - - - - - - - -
-
kWh
$4,500
326
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$3,300
Cost:
$3,000
- - - - - - $2,100 270,000 - - $1,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,100
270,000
Tgal
-
-
$
$1,200
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,100
Cost:
$570
$3,100 59,100 - - - - - - - - - - $3,100
59,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,010
Cost:
-
$620 11,400 $390 28 - - - - - - - - $620
11,400
kWh
$390
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$150,326
Cost:
$306,515
$76,280 1,412,810 $37,546 2,704 $20,600 3,100 $2,100 270,000 $12,600 - $1,200 - $76,280
1,412,810
kWh
$37,546
2,704
kW-months/year
$20,600
3,100
MMBtu
$2,100
270,000
Tgal
$12,600
-
$
$1,200
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption