IAC logo
IAC Assessment: AM0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product Structural steel fabrication
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 6,000 Tons
Production Hrs. Annual 2,610
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,282 679,076 kWh $0.07
Electricity Demand $23,128 3,267 kW-months/year $7.08
Electricity Fees $4,911 - $ -
Natural Gas $1,894 206 MMBtu $9.19
TOTAL ENERGY COSTS $78,215
RECOMMENDED SAVINGS* $30,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$10,800
Cost:
$600
- - - - $10,800 - -
-
kWh
-
-
kW-months/year
$10,800
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,300
Cost:
$19,670
$7,200 98,700 $3,100 454 - - $7,200
98,700
kWh
$3,100
454
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,990
Cost:
$350
$2,090 28,600 $900 132 - - $2,090
28,600
kWh
$900
132
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$975
Cost:
$15
$680 9,300 $295 43 - - $680
9,300
kWh
$295
43
kW-months/year
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$285
Cost:
-
$200 2,710 $85 12 - - $200
2,710
kWh
$85
12
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$250
Cost:
$15
$175 2,420 $75 11 - - $175
2,420
kWh
$75
11
kW-months/year
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$3,330
Cost:
$10,400
$3,330 45,675 - - - - $3,330
45,675
kWh
-
-
kW-months/year
-
-
$
08: 2.7145 INSTALL SKYLIGHTS Savings:
$1,300
Cost:
$3,170
$1,300 17,760 - - - - $1,300
17,760
kWh
-
-
kW-months/year
-
-
$
09: 2.7145 INSTALL SKYLIGHTS Savings:
$520
Cost:
$1,410
$520 7,010 - - - - $520
7,010
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$30,750
Cost:
$35,630
$15,495 212,175 $4,455 652 $10,800 - $15,495
212,175
kWh
$4,455
652
kW-months/year
$10,800
-
$
TOTAL IMPLEMENTED Savings:
$14,800
Cost:
$20,050
$10,345 141,730 $4,455 652 - - $10,345
141,730
kWh
$4,455
652
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $