IAC logo
IAC Assessment: AM0632
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0632
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2013
Principal Product Truck Cranes
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3536 - Hoists, Cranes, And Monorails
Sales $100,000,000-$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 412,000
Annual Production 45 Pieces
Production Hrs. Annual 4,706
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,064 1,593,600 kWh $0.07
Electricity Demand $37,800 5,280 kW-months/year $7.16
Electricity Fees $9,674 - $ -
Natural Gas $34,959 5,919 MMBtu $5.91
TOTAL ENERGY COSTS $203,481
RECOMMENDED SAVINGS* $58,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,488
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Fees Water Disposal Other Liquid (non-haz)
$ kWh $ $ $ Tgal $ gal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$33,800
Cost:
$3,800
$33,800 471,800 - - - - - - $33,800
471,800
kWh
-
-
$
-
-
Tgal
-
-
gal
02: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$11,000
Cost:
$600
- - - - - - $11,000 950 -
-
kWh
-
-
$
-
-
Tgal
$11,000
950
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,350
Cost:
$3,440
$9,350 88,330 - - - - - - $9,350
88,330
kWh
-
-
$
-
-
Tgal
-
-
gal
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,900
Cost:
-
$1,900 26,800 - - - - - - $1,900
26,800
kWh
-
-
$
-
-
Tgal
-
-
gal
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,105
Cost:
-
$1,105 15,426 - - - - - - $1,105
15,426
kWh
-
-
$
-
-
Tgal
-
-
gal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$788
Cost:
$1,088
- - - - $788 179,020 - - -
-
kWh
-
-
$
$788
179,020
Tgal
-
-
gal
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$687
Cost:
$1,374
- - $687 - - - - - -
-
kWh
$687
-
$
-
-
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$58,630
Cost:
$10,302
$46,155 602,356 $687 - $788 179,020 $11,000 950 $46,155
602,356
kWh
$687
-
$
$788
179,020
Tgal
$11,000
950
gal
TOTAL IMPLEMENTED Savings:
$47,488
Cost:
$5,488
$35,700 498,600 - - $788 179,020 $11,000 950 $35,700
498,600
kWh
-
-
$
$788
179,020
Tgal
$11,000
950
gal
Savings
Cost
$ kWh $ $ $ Tgal $ gal
Electricity Usage Electricity Fees Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Fees Water Disposal Other Liquid (non-haz)