Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2013 |
Principal Product | Truck Cranes |
NAICS | 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3536 - Hoists, Cranes, And Monorails |
Sales | $100,000,000-$500,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 412,000 |
Annual Production | 45 Pieces |
Production Hrs. Annual | 4,706 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $114,064 | 1,593,600 | kWh | $0.07 |
Electricity Demand | $37,800 | 5,280 | kW-months/year | $7.16 |
Electricity Fees | $9,674 | - | $ | - |
Natural Gas | $34,959 | 5,919 | MMBtu | $5.91 |
TOTAL ENERGY COSTS | $203,481 | |||
RECOMMENDED SAVINGS* | $58,630 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,488 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Fees | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $33,800 Cost: $3,800 |
$33,800 | 471,800 | - | - | - | - | - | - |
$33,800 471,800 kWh |
- - $ |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $11,000 Cost: $600 |
- | - | - | - | - | - | $11,000 | 950 |
- - kWh |
- - $ |
- - Tgal |
$11,000 950 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,350 Cost: $3,440 |
$9,350 | 88,330 | - | - | - | - | - | - |
$9,350 88,330 kWh |
- - $ |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,900 Cost: - |
$1,900 | 26,800 | - | - | - | - | - | - |
$1,900 26,800 kWh |
- - $ |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,105 Cost: - |
$1,105 | 15,426 | - | - | - | - | - | - |
$1,105 15,426 kWh |
- - $ |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $788 Cost: $1,088 |
- | - | - | - | $788 | 179,020 | - | - |
- - kWh |
- - $ |
$788 179,020 Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $687 Cost: $1,374 |
- | - | $687 | - | - | - | - | - |
- - kWh |
$687 - $ |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,630 Cost: $10,302 |
$46,155 | 602,356 | $687 | - | $788 | 179,020 | $11,000 | 950 | $46,155 602,356 kWh |
$687 - $ |
$788 179,020 Tgal |
$11,000 950 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,488 Cost: $5,488 |
$35,700 | 498,600 | - | - | $788 | 179,020 | $11,000 | 950 | $35,700 498,600 kWh |
- - $ |
$788 179,020 Tgal |
$11,000 950 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Fees | Water Disposal | Other Liquid (non-haz) |