IAC logo
IAC Assessment: AM0645
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0645
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2013
Principal Product modular and conventional telephone station apparatus
NAICS 334290 - Other Communications Equipment Manufacturing
SIC 3669 - Communications Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 250,000
Annual Production 224,000,000 Pieces
Production Hrs. Annual 8,496
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,263 8,218,800 kWh $0.02
Electricity Demand $121,724 17,868 kW-months/year $6.81
Electricity Fees $186,600 - $ -
Natural Gas $5,942 1,165 MMBtu $5.10
TOTAL ENERGY COSTS $455,529
RECOMMENDED SAVINGS* $17,295 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,745
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,885
Cost:
$63,000
$1,700 99,800 $4,285 507 - - $3,900 - $1,700
99,800
kWh
$4,285
507
kW-months/year
-
-
Tgal
$3,900
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,290
Cost:
$750
$1,350 79,345 $940 116 - - - - $1,350
79,345
kWh
$940
116
kW-months/year
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$570
Cost:
$60
$340 19,930 $230 28 - - - - $340
19,930
kWh
$230
28
kW-months/year
-
-
Tgal
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,070
Cost:
-
- - $4,070 503 - - - - -
-
kWh
$4,070
503
kW-months/year
-
-
Tgal
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$480
Cost:
$1,000
- - - - $480 99,600 - - -
-
kWh
-
-
kW-months/year
$480
99,600
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$17,295
Cost:
$64,810
$3,390 199,075 $9,525 1,154 $480 99,600 $3,900 - $3,390
199,075
kWh
$9,525
1,154
kW-months/year
$480
99,600
Tgal
$3,900
-
$
TOTAL IMPLEMENTED Savings:
$12,745
Cost:
$63,810
$3,390 199,075 $5,455 651 - - $3,900 - $3,390
199,075
kWh
$5,455
651
kW-months/year
-
-
Tgal
$3,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes