IAC logo
IAC Assessment: AM0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2014
Principal Product Poultry Products
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 1,300
Plant Area (Sq.Ft.) 216,000
Annual Production 407,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,495,192 36,568,800 kWh $0.04
Electricity Demand $878,618 71,275 kW-months/year $12.33
Electricity Fees $543 - $ -
Natural Gas $189,985 52,030 MMBtu $3.65
TOTAL ENERGY COSTS $2,564,338
RECOMMENDED SAVINGS* $42,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,055
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,150
Cost:
$16,680
$12,770 311,570 $5,380 437 $12,770
311,570
kWh
$5,380
437
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,770
Cost:
$21,200
$10,400 254,000 $4,370 355 $10,400
254,000
kWh
$4,370
355
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,420
Cost:
$450
$2,340 57,000 $2,080 169 $2,340
57,000
kWh
$2,080
169
kW-months/year
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,540
Cost:
-
$1,800 44,000 $740 60 $1,800
44,000
kWh
$740
60
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,365
Cost:
$330
$1,670 40,880 $695 56 $1,670
40,880
kWh
$695
56
kW-months/year
TOTAL RECOMMENDED Savings:
$42,245
Cost:
$38,660
$28,980 707,450 $13,265 1,077 $28,980
707,450
kWh
$13,265
1,077
kW-months/year
TOTAL IMPLEMENTED Savings:
$23,055
Cost:
$17,010
$16,240 396,450 $6,815 553 $16,240
396,450
kWh
$6,815
553
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand