IAC logo
IAC Assessment: AM0659
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0659
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2014
Principal Product vertical centrifugal pumps
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 60,000
Annual Production 360 Pieces
Production Hrs. Annual 2,450
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,900 559,035 kWh $0.06
Electricity Demand $25,300 4,382 kW-months/year $5.77
Electricity Fees $5,117 - $ -
Natural Gas $12,120 1,303 MMBtu $9.30
TOTAL ENERGY COSTS $74,437
RECOMMENDED SAVINGS* $32,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,815
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,940
Cost:
$11,920
$5,460 95,800 $3,480 602 - - - - - - $5,460
95,800
kWh
$3,480
602
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$16,935
Cost:
$3,000
- - - - $5,117 - - - $11,818 - -
-
kWh
-
-
kW-months/year
$5,117
-
$
-
-
$
$11,818
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,840
Cost:
$18,470
- - $4,840 767 - - - - - - -
-
kWh
$4,840
767
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,040
Cost:
$250
$640 11,200 $400 70 - - - - - - $640
11,200
kWh
$400
70
kW-months/year
-
-
$
-
-
$
-
-
$
05: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$560
Cost:
$600
- - - - - - $560 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$560
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$360
Cost:
-
$220 3,890 $140 24 - - - - - - $220
3,890
kWh
$140
24
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$115
Cost:
-
$115 2,520 - - - - - - - - $115
2,520
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,790
Cost:
$34,240
$6,435 113,410 $8,860 1,463 $5,117 - $560 - $11,818 - $6,435
113,410
kWh
$8,860
1,463
kW-months/year
$5,117
-
$
$560
-
$
$11,818
-
$
TOTAL IMPLEMENTED Savings:
$22,815
Cost:
$21,720
$640 11,200 $5,240 837 $5,117 - - - $11,818 - $640
11,200
kWh
$5,240
837
kW-months/year
$5,117
-
$
-
-
$
$11,818
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost