IAC Assessment: AM0664
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0664
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2014
Principal Product Lime Processing
NAICS 327410 - Lime Manufacturing
SIC 3274 - Lime
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 47,916,000
Annual Production 300,000 Tons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $859,399 19,670,155 kWh $0.04
Electricity Demand $279,012 41,095 kW-months/year $6.79
Electricity Fees $28,212 - $ -
Natural Gas $1,073,145 149,400 MMBtu $7.18
TOTAL ENERGY COSTS $2,239,768
RECOMMENDED SAVINGS* $89,905 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,655
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$46,500
Cost:
$51,870
- - $46,500 6,850 - - - - -
-
kWh
$46,500
6,850
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,030
Cost:
$3,600
$13,800 321,600 $2,990 440 $240 - - - $13,800
321,600
kWh
$2,990
440
kW-months/year
$240
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,750
Cost:
$12
$5,920 137,700 $1,830 270 - - - - $5,920
137,700
kWh
$1,830
270
kW-months/year
-
-
$
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$7,770
Cost:
$1,200
$7,300 170,000 - - $250 - $220 - $7,300
170,000
kWh
-
-
kW-months/year
$250
-
$
$220
-
$
05: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$5,260
Cost:
-
$3,630 84,410 $1,630 240 - - - - $3,630
84,410
kWh
$1,630
240
kW-months/year
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,970
Cost:
$4,550
$4,085 95,010 $885 130 - - - - $4,085
95,010
kWh
$885
130
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$625
Cost:
$870
$625 14,520 - - - - - - $625
14,520
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,905
Cost:
$62,102
$35,360 823,240 $53,835 7,930 $490 - $220 - $35,360
823,240
kWh
$53,835
7,930
kW-months/year
$490
-
$
$220
-
$
TOTAL IMPLEMENTED Savings:
$35,655
Cost:
$10,220
$29,440 685,540 $5,505 810 $490 - $220 - $29,440
685,540
kWh
$5,505
810
kW-months/year
$490
-
$
$220
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost