IAC logo
IAC Assessment: AM0665
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0665
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2014
Principal Product Wooden prehung and steel doors
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 148
Plant Area (Sq.Ft.) 175,000
Annual Production 912,000 Pieces
Production Hrs. Annual 4,267
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,182 1,247,800 kWh $0.05
Electricity Demand $20,956 2,865 kW-months/year $7.31
Electricity Fees $9,246 - $ -
Natural Gas $5,506 694 MMBtu $7.93
TOTAL ENERGY COSTS $94,890
RECOMMENDED SAVINGS* $83,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,280
Cost:
$17,710
$19,110 406,700 $8,170 1,144 - - - - - - - - $19,110
406,700
kWh
$8,170
1,144
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,930
Cost:
$4,000
- - - - - - $(-460) (-60) $12,390 4,400 - - -
-
kWh
-
-
kW-months/year
-
-
$
$(-460)
(-60)
MMBtu
$12,390
4,400
Tgal
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$34,980
Cost:
$10,000
- - - - $6,996 - - - - - $27,984 - -
-
kWh
-
-
kW-months/year
$6,996
-
$
-
-
MMBtu
-
-
Tgal
$27,984
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,080
Cost:
$2,000
$4,260 90,700 $1,820 255 - - - - - - - - $4,260
90,700
kWh
$1,820
255
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,020
Cost:
$1,485
$1,420 30,200 $600 84 - - - - - - - - $1,420
30,200
kWh
$600
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,235
Cost:
$10
$865 18,400 $370 52 - - - - - - - - $865
18,400
kWh
$370
52
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$310
Cost:
-
$210 4,480 $100 14 - - - - - - - - $210
4,480
kWh
$100
14
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$83,835
Cost:
$35,205
$25,865 550,480 $11,060 1,549 $6,996 - $(-460) (-60) $12,390 4,400 $27,984 - $25,865
550,480
kWh
$11,060
1,549
kW-months/year
$6,996
-
$
$(-460)
(-60)
MMBtu
$12,390
4,400
Tgal
$27,984
-
$
TOTAL IMPLEMENTED Savings:
$70,360
Cost:
$31,195
$24,790 527,600 $10,590 1,483 $6,996 - - - - - $27,984 - $24,790
527,600
kWh
$10,590
1,483
kW-months/year
$6,996
-
$
-
-
MMBtu
-
-
Tgal
$27,984
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal One-time Revenue or Avoided Cost