IAC logo
IAC Assessment: AM0684
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0684
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2015
Principal Product Threaded pipe coupling
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 131
Plant Area (Sq.Ft.) 45,500
Annual Production 300,000 Pieces
Production Hrs. Annual 2,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,122 6,369,144 kWh $0.04
Electricity Demand $176,528 13,305 kW-months/year $13.27
Electricity Fees $2,668 - $ -
TOTAL ENERGY COSTS $442,318
RECOMMENDED SAVINGS* $71,836 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$24,700
Cost:
-
$10,700 242,400 $14,000 1,170 - - $10,700
242,400
kWh
$14,000
1,170
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,370
Cost:
-
$33,400 758,000 $21,470 1,780 $(-40,500) (-3,960) $33,400
758,000
kWh
$21,470
1,780
kW-months/year
$(-40,500)
(-3,960)
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,080
Cost:
$2,200
$6,080 138,220 $8,000 660 - - $6,080
138,220
kWh
$8,000
660
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,800
Cost:
$6,740
$5,500 125,800 $7,300 600 - - $5,500
125,800
kWh
$7,300
600
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,410
Cost:
$11
$1,820 41,400 $3,590 300 - - $1,820
41,400
kWh
$3,590
300
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$476
Cost:
$1,545
$206 4,680 $270 22 - - $206
4,680
kWh
$270
22
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$71,836
Cost:
$10,496
$57,706 1,310,500 $54,630 4,532 $(-40,500) (-3,960) $57,706
1,310,500
kWh
$54,630
4,532
kW-months/year
$(-40,500)
(-3,960)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas