Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2015 |
Principal Product | Gears and couplings |
NAICS | 333613 - Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568 - Power Transmission Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 7,800 Pieces |
Production Hrs. Annual | 6,416 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $158,203 | 1,876,825 | kWh | $0.08 |
Electricity Demand | $25,984 | 4,724 | kW-months/year | $5.50 |
Electricity Fees | $6,131 | - | $ | - |
Natural Gas | $5,306 | 616 | MMBtu | $8.61 |
TOTAL ENERGY COSTS | $195,624 | |||
RECOMMENDED SAVINGS* | $36,179 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $9,770 Cost: - |
$9,770 | 131,000 | - | - | - | - | - | - |
$9,770 131,000 kWh |
- - kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $2,790 Cost: - |
$2,090 | 28,000 | $700 | 130 | - | - | - | - |
$2,090 28,000 kWh |
$700 130 kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $895 Cost: $5 |
$745 | 9,990 | $150 | 27 | - | - | - | - |
$745 9,990 kWh |
$150 27 kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,390 Cost: $5,700 |
$4,390 | 58,800 | - | - | - | - | - | - |
$4,390 58,800 kWh |
- - kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $455 Cost: $220 |
$400 | 5,360 | $55 | 10 | - | - | - | - |
$400 5,360 kWh |
$55 10 kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $12,685 Cost: $17,600 |
$(-4,415) | (-59,160) | - | - | - | - | $17,100 | 22,800 |
$(-4,415) (-59,160) kWh |
- - kW-months/year |
- - $ |
$17,100 22,800 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,490 Cost: $500 |
$1,310 | 17,600 | $180 | 33 | - | - | - | - |
$1,310 17,600 kWh |
$180 33 kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,915 Cost: $1,810 |
$1,685 | 22,600 | $230 | 42 | - | - | - | - |
$1,685 22,600 kWh |
$230 42 kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $1,789 Cost: - |
- | - | - | - | $1,789 | - | - | - |
- - kWh |
- - kW-months/year |
$1,789 - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,179 Cost: $25,835 |
$15,975 | 214,190 | $1,315 | 242 | $1,789 | - | $17,100 | 22,800 | $15,975 214,190 kWh |
$1,315 242 kW-months/year |
$1,789 - $ |
$17,100 22,800 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) |