IAC logo
IAC Assessment: AM0686
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0686
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2015
Principal Product Gears and couplings
NAICS 333613 - Mechanical Power Transmission Equipment Manufacturing
SIC 3568 - Power Transmission Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 7,800 Pieces
Production Hrs. Annual 6,416
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,203 1,876,825 kWh $0.08
Electricity Demand $25,984 4,724 kW-months/year $5.50
Electricity Fees $6,131 - $ -
Natural Gas $5,306 616 MMBtu $8.61
TOTAL ENERGY COSTS $195,624
RECOMMENDED SAVINGS* $36,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ gal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,770
Cost:
-
$9,770 131,000 - - - - - - $9,770
131,000
kWh
-
-
kW-months/year
-
-
$
-
-
gal
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,790
Cost:
-
$2,090 28,000 $700 130 - - - - $2,090
28,000
kWh
$700
130
kW-months/year
-
-
$
-
-
gal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$895
Cost:
$5
$745 9,990 $150 27 - - - - $745
9,990
kWh
$150
27
kW-months/year
-
-
$
-
-
gal
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,390
Cost:
$5,700
$4,390 58,800 - - - - - - $4,390
58,800
kWh
-
-
kW-months/year
-
-
$
-
-
gal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$455
Cost:
$220
$400 5,360 $55 10 - - - - $400
5,360
kWh
$55
10
kW-months/year
-
-
$
-
-
gal
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$12,685
Cost:
$17,600
$(-4,415) (-59,160) - - - - $17,100 22,800 $(-4,415)
(-59,160)
kWh
-
-
kW-months/year
-
-
$
$17,100
22,800
gal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,490
Cost:
$500
$1,310 17,600 $180 33 - - - - $1,310
17,600
kWh
$180
33
kW-months/year
-
-
$
-
-
gal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,915
Cost:
$1,810
$1,685 22,600 $230 42 - - - - $1,685
22,600
kWh
$230
42
kW-months/year
-
-
$
-
-
gal
09: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,789
Cost:
-
- - - - $1,789 - - - -
-
kWh
-
-
kW-months/year
$1,789
-
$
-
-
gal
TOTAL RECOMMENDED Savings:
$36,179
Cost:
$25,835
$15,975 214,190 $1,315 242 $1,789 - $17,100 22,800 $15,975
214,190
kWh
$1,315
242
kW-months/year
$1,789
-
$
$17,100
22,800
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)