IAC Assessment: AM0704
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0704
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Steel pipe for O&G
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $100,000,000-$500,000,000
# of Employees 673
Plant Area (Sq.Ft.) 600,000
Annual Production 96,000 Pieces
Production Hrs. Annual 5,976
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,783,442 49,083,660 kWh $0.04
Electricity Demand $1,471,676 133,186 kW-months/year $11.05
Electricity Fees $32,104 - $ -
Natural Gas $1,258,154 310,424 MMBtu $4.05
TOTAL ENERGY COSTS $4,545,376
RECOMMENDED SAVINGS* $499,273 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $493,558
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$203,006
Cost:
-
$70,515 - $132,491 - - - - - - - $70,515
-
kWh
$132,491
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$101,844
Cost:
-
$(-26,016) - $127,860 - - - - - - - $(-26,016)
-
kWh
$127,860
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$32,650
Cost:
$9,000
- - - - - - $(-2,150) (-513) $34,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-2,150)
(-513)
MMBtu
$34,800
-
Tgal
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$91,870
Cost:
-
- - - - $91,870 - - - - - -
-
kWh
-
-
kW-months/year
$91,870
-
$
-
-
MMBtu
-
-
Tgal
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,510
Cost:
$20,730
- - $23,510 2,055 - - - - - - -
-
kWh
$23,510
2,055
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,685
Cost:
$28,500
$14,020 333,820 $7,665 670 - - - - - - $14,020
333,820
kWh
$7,665
670
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,750
Cost:
$5,000
$4,980 138,335 $4,770 417 - - - - - - $4,980
138,335
kWh
$4,770
417
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,395
Cost:
$30
$3,245 90,190 $2,150 272 - - - - - - $3,245
90,190
kWh
$2,150
272
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
09: 2.7145 INSTALL SKYLIGHTS Savings:
$3,375
Cost:
-
$3,375 80,390 - - - - - - - - $3,375
80,390
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,510
Cost:
-
$2,510 59,780 - - - - - - - - $2,510
59,780
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
11: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,440
Cost:
$650
$1,400 36,570 $1,040 110 - - - - - - $1,400
36,570
kWh
$1,040
110
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$918
Cost:
$3,100
- - $918 138 - - - - - - -
-
kWh
$918
138
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
13: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$320
Cost:
-
$320 7,565 - - - - - - - - $320
7,565
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$499,273
Cost:
$67,010
$74,349 746,650 $300,404 3,662 $91,870 - $(-2,150) (-513) $34,800 - $74,349
746,650
kWh
$300,404
3,662
kW-months/year
$91,870
-
$
$(-2,150)
(-513)
MMBtu
$34,800
-
Tgal
TOTAL IMPLEMENTED Savings:
$493,558
Cost:
$66,980
$70,784 648,895 $298,254 3,390 $91,870 - $(-2,150) (-513) $34,800 - $70,784
648,895
kWh
$298,254
3,390
kW-months/year
$91,870
-
$
$(-2,150)
(-513)
MMBtu
$34,800
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal