IAC Assessment: AM0706
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0706
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Plastic food containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 80,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,659 3,714,640 kWh $0.03
Electricity Demand $47,988 6,471 kW-months/year $7.42
Electricity Fees $3,400 - $ -
TOTAL ENERGY COSTS $160,047
RECOMMENDED SAVINGS* $29,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,573
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,870
Cost:
$20
$7,880 143,280 $1,990 340 - - $7,880
143,280
kWh
$1,990
340
kW-months/year
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,000
Cost:
-
$8,000 145,700 - - - - $8,000
145,700
kWh
-
-
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,687
Cost:
$19,900
- - $5,687 971 - - -
-
kWh
$5,687
971
kW-months/year
-
-
$
04: 2.9131 INSTALL HYDROGEN FUEL CELL Savings:
$3,180
Cost:
-
$1,010 18,360 - - $2,170 - $1,010
18,360
kWh
-
-
kW-months/year
$2,170
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,425
Cost:
$1,350
$1,425 25,900 - - - - $1,425
25,900
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$940
Cost:
$200
$750 13,660 $190 32 - - $750
13,660
kWh
$190
32
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$586
Cost:
$200
$130 2,505 $18 4 $438 - $130
2,505
kWh
$18
4
kW-months/year
$438
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$65
Cost:
$60
$65 1,230 - - - - $65
1,230
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$29,753
Cost:
$21,730
$19,260 350,635 $7,885 1,347 $2,608 - $19,260
350,635
kWh
$7,885
1,347
kW-months/year
$2,608
-
$
TOTAL IMPLEMENTED Savings:
$18,573
Cost:
$21,730
$10,250 186,575 $7,885 1,347 $438 - $10,250
186,575
kWh
$7,885
1,347
kW-months/year
$438
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes