IAC Assessment: AM0711
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0711
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Organic peroxides
NAICS 325110 - Petrochemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 640,000
Annual Production 11,100,000 Units
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $599,657 14,859,841 kWh $0.04
Electricity Demand $252,813 26,116 kW-months/year $9.68
Electricity Fees $2,048 - $ -
Natural Gas $132,299 33,284 MMBtu $3.97
TOTAL ENERGY COSTS $986,817
RECOMMENDED SAVINGS* $166,212 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,860
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$62,500
Cost:
$108,300
$47,000 1,163,640 $15,500 1,600 - - - - - - $47,000
1,163,640
kWh
$15,500
1,600
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,350
Cost:
$57,195
$19,050 471,613 $6,300 648 - - - - - - $19,050
471,613
kWh
$6,300
648
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$22,630
Cost:
$9,030
$16,790 415,600 $5,840 600 - - - - - - $16,790
415,600
kWh
$5,840
600
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,515
Cost:
$60,200
- - $18,515 2,048 - - - - - - -
-
kWh
$18,515
2,048
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$17,450
Cost:
$26
- - - - - - $17,450 3,930 - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,450
3,930
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$11,000
Cost:
$13
$8,160 201,900 $2,840 292 - - - - - - $8,160
201,900
kWh
$2,840
292
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,344
Cost:
$2,620
$174 4,296 $4,170 429 - - - - - - $174
4,296
kWh
$4,170
429
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,880
Cost:
-
- - - - - - $3,480 783 $(-600) - -
-
kWh
-
-
kW-months/year
-
-
$
$3,480
783
MMBtu
$(-600)
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,072
Cost:
-
$728 18,020 $344 35 - - - - - - $728
18,020
kWh
$344
35
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$471
Cost:
-
- - - - $471 - - - - - -
-
kWh
-
-
kW-months/year
$471
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$166,212
Cost:
$237,384
$91,902 2,275,069 $53,509 5,652 $471 - $20,930 4,713 $(-600) - $91,902
2,275,069
kWh
$53,509
5,652
kW-months/year
$471
-
$
$20,930
4,713
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$50,860
Cost:
$66,225
$35,840 887,213 $12,140 1,248 - - $3,480 783 $(-600) - $35,840
887,213
kWh
$12,140
1,248
kW-months/year
-
-
$
$3,480
783
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost