IAC Assessment: AM0712
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0712
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Pumps and process systems
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 125,000
Annual Production 75 Units
Production Hrs. Annual 5,166
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,217 1,480,720 kWh $0.08
Electricity Demand $77,815 8,092 kW-months/year $9.62
Electricity Fees $1,782 - $ -
Natural Gas $23,222 4,745 MMBtu $4.89
TOTAL ENERGY COSTS $322,944
RECOMMENDED SAVINGS* $88,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$48,140
Cost:
$2,710
- - - - $48,140 415 - - -
-
kWh
-
-
kW-months/year
$48,140
415
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,510
Cost:
$46,840
$16,840 320,750 $7,670 745 - - - - $16,840
320,750
kWh
$7,670
745
kW-months/year
-
-
gal
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,700
Cost:
$26,740
- - $11,700 1,137 - - - - -
-
kWh
$11,700
1,137
kW-months/year
-
-
gal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,710
Cost:
$30
$1,770 33,730 $940 91 - - - - $1,770
33,730
kWh
$940
91
kW-months/year
-
-
gal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
$200
$310 5,990 $140 14 - - - - $310
5,990
kWh
$140
14
kW-months/year
-
-
gal
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$400
Cost:
-
$260 4,980 $140 14 - - - - $260
4,980
kWh
$140
14
kW-months/year
-
-
gal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
$150
$40 720 $10 1 - - $300 - $40
720
kWh
$10
1
kW-months/year
-
-
gal
$300
-
$
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$110
Cost:
$280
$60 1,180 $50 5 - - - - $60
1,180
kWh
$50
5
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$88,370
Cost:
$76,950
$19,280 367,350 $20,650 2,007 $48,140 415 $300 - $19,280
367,350
kWh
$20,650
2,007
kW-months/year
$48,140
415
gal
$300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes