Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2016 |
Principal Product | Pumps and process systems |
NAICS | 333911 - Pump and Pumping Equipment Manufacturing |
SIC | 3561 - Pumps And Pumping Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 75 Units |
Production Hrs. Annual | 5,166 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $114,217 | 1,480,720 | kWh | $0.08 |
Electricity Demand | $77,815 | 8,092 | kW-months/year | $9.62 |
Electricity Fees | $1,782 | - | $ | - |
Natural Gas | $23,222 | 4,745 | MMBtu | $4.89 |
TOTAL ENERGY COSTS | $322,944 | |||
RECOMMENDED SAVINGS* | $88,370 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $48,140 Cost: $2,710 |
- | - | - | - | $48,140 | 415 | - | - |
- - kWh |
- - kW-months/year |
$48,140 415 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,510 Cost: $46,840 |
$16,840 | 320,750 | $7,670 | 745 | - | - | - | - |
$16,840 320,750 kWh |
$7,670 745 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,700 Cost: $26,740 |
- | - | $11,700 | 1,137 | - | - | - | - |
- - kWh |
$11,700 1,137 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,710 Cost: $30 |
$1,770 | 33,730 | $940 | 91 | - | - | - | - |
$1,770 33,730 kWh |
$940 91 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $450 Cost: $200 |
$310 | 5,990 | $140 | 14 | - | - | - | - |
$310 5,990 kWh |
$140 14 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $400 Cost: - |
$260 | 4,980 | $140 | 14 | - | - | - | - |
$260 4,980 kWh |
$140 14 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $350 Cost: $150 |
$40 | 720 | $10 | 1 | - | - | $300 | - |
$40 720 kWh |
$10 1 kW-months/year |
- - gal |
$300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $110 Cost: $280 |
$60 | 1,180 | $50 | 5 | - | - | - | - |
$60 1,180 kWh |
$50 5 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,370 Cost: $76,950 |
$19,280 | 367,350 | $20,650 | 2,007 | $48,140 | 415 | $300 | - | $19,280 367,350 kWh |
$20,650 2,007 kW-months/year |
$48,140 415 gal |
$300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes |