IAC logo
IAC Assessment: AM0713
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0713
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Quicklime, dolime
NAICS 327410 - Lime Manufacturing
SIC 3274 - Lime
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 100,000
Annual Production 40,000 Tons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $687,068 18,617,000 kWh $0.04
Electricity Demand $303,836 48,928 kW-months/year $6.21
Electricity Fees $3,277 - $ -
Natural Gas $785,500 279,764 MMBtu $2.81
TOTAL ENERGY COSTS $1,779,681
RECOMMENDED SAVINGS* $526,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$453,910
Cost:
$3,100,000
$342,500 7,446,000 $111,410 12,000 $342,500
7,446,000
kWh
$111,410
12,000
kW-months/year
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$58,650
Cost:
$76,000
- - $58,650 6,317 -
-
kWh
$58,650
6,317
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,870
Cost:
$16,220
$3,940 85,750 $1,930 208 $3,940
85,750
kWh
$1,930
208
kW-months/year
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,600
Cost:
-
$3,150 68,440 $1,450 156 $3,150
68,440
kWh
$1,450
156
kW-months/year
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,460
Cost:
$3,900
$3,460 75,320 - - $3,460
75,320
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$526,490
Cost:
$3,196,120
$353,050 7,675,510 $173,440 18,681 $353,050
7,675,510
kWh
$173,440
18,681
kW-months/year
TOTAL IMPLEMENTED Savings:
$72,580
Cost:
$96,120
$10,550 229,510 $62,030 6,681 $10,550
229,510
kWh
$62,030
6,681
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand