Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Corrugated expansion joints for pressure piping applications
NAICS 332991 - Ball and Roller Bearing Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 88,618
Annual Production 3,338 Tons
Production Hrs. Annual 4,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,983 1,544,480 kWh $0.05
Electricity Demand $28,149 4,959 kW-months/year $5.68
Electricity Fees $4,886 - $ -
Natural Gas $24,323 4,030 MMBtu $6.04
TOTAL ENERGY COSTS $136,341
RECOMMENDED SAVINGS* $21,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,272
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,440
Cost:
$2,000
$4,950 97,090 $1,490 259 - - - - - - $4,950
97,090
kWh
$1,490
259
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,960
Cost:
-
$4,960 97,230 - - - - - - - - $4,960
97,230
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$4,710
Cost:
$360
- - - - $4,710 855 - - - - -
-
kWh
-
-
kW-months/year
$4,710
855
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,240
Cost:
$2,410
$2,490 48,790 $750 130 - - - - - - $2,490
48,790
kWh
$750
130
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,632
Cost:
$670
$150 2,860 $22 4 - - $990 - $470 - $150
2,860
kWh
$22
4
kW-months/year
-
-
MMBtu
$990
-
$
$470
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$530
Cost:
$360
$530 10,370 - - - - - - - - $530
10,370
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$420
Cost:
-
$200 3,970 $220 38 - - - - - - $200
3,970
kWh
$220
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,932
Cost:
$5,800
$13,280 260,310 $2,482 431 $4,710 855 $990 - $470 - $13,280
260,310
kWh
$2,482
431
kW-months/year
$4,710
855
MMBtu
$990
-
$
$470
-
$
TOTAL IMPLEMENTED Savings:
$16,272
Cost:
$5,080
$12,550 245,970 $2,262 393 - - $990 - $470 - $12,550
245,970
kWh
$2,262
393
kW-months/year
-
-
MMBtu
$990
-
$
$470
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost