IAC Assessment: AM0726
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0726
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2017
Principal Product Plastic injection molded automotive parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 242,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 7,248
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,122,922 20,797,631 kWh $0.05
Electricity Demand $629,916 39,760 kW-months/year $15.84
Electricity Fees $103,693 - $ -
Natural Gas $682 374 MMBtu $1.82
TOTAL ENERGY COSTS $2,057,213
RECOMMENDED SAVINGS* $322,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,705
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$268,194
Cost:
$100,000
- - - - - - - - $268,194 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$268,194
-
$
-
-
$
02: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$13,960
Cost:
$1,200
- - - - - - $3,030 3,012 - - $10,930 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,030
3,012
lb
-
-
$
$10,930
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$15,714
Cost:
-
- - - - $15,714 - - - - - - - -
-
kWh
-
-
kW-months/year
$15,714
-
$
-
-
lb
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,440
Cost:
$1,904
$8,770 175,310 $4,670 290 - - - - - - - - $8,770
175,310
kWh
$4,670
290
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,305
Cost:
$6,120
$4,940 98,720 $4,365 271 - - - - - - - - $4,940
98,720
kWh
$4,365
271
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,185
Cost:
$265
$2,185 43,710 - - - - - - - - - - $2,185
43,710
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$155
Cost:
$220
$155 3,130 - - - - - - - - - - $155
3,130
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$322,953
Cost:
$109,709
$16,050 320,870 $9,035 561 $15,714 - $3,030 3,012 $268,194 - $10,930 - $16,050
320,870
kWh
$9,035
561
kW-months/year
$15,714
-
$
$3,030
3,012
lb
$268,194
-
$
$10,930
-
$
TOTAL IMPLEMENTED Savings:
$36,705
Cost:
$9,224
$13,710 274,030 $9,035 561 - - $3,030 3,012 - - $10,930 - $13,710
274,030
kWh
$9,035
561
kW-months/year
-
-
$
$3,030
3,012
lb
-
-
$
$10,930
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost