IAC Assessment: AM0729
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0729
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2017
Principal Product Mechanical cable controls and pedals for industrial applications
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 78,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 2,008
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,082 1,659,146 kWh $0.05
Electricity Demand $57,438 5,093 kW-months/year $11.28
Electricity Fees $3,825 - $ -
Natural Gas $1,824 282 MMBtu $6.47
TOTAL ENERGY COSTS $151,169
RECOMMENDED SAVINGS* $28,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,865
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$6,900
Cost:
-
- - - - $6,900 27,610 -
-
kWh
-
-
kW-months/year
$6,900
27,610
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,965
Cost:
$28,840
$4,815 96,300 $6,150 510 - - $4,815
96,300
kWh
$6,150
510
kW-months/year
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,490
Cost:
$3,740
- - $3,490 288 - - -
-
kWh
$3,490
288
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,930
Cost:
$1,000
$1,200 24,100 $1,730 144 - - $1,200
24,100
kWh
$1,730
144
kW-months/year
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,770
Cost:
$1,000
$1,540 30,800 $2,230 185 - - $1,540
30,800
kWh
$2,230
185
kW-months/year
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$580
Cost:
$220
$580 11,675 - - - - $580
11,675
kWh
-
-
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$28,635
Cost:
$34,800
$8,135 162,875 $13,600 1,127 $6,900 27,610 $8,135
162,875
kWh
$13,600
1,127
kW-months/year
$6,900
27,610
lb
TOTAL IMPLEMENTED Savings:
$24,865
Cost:
$33,800
$6,595 132,075 $11,370 942 $6,900 27,610 $6,595
132,075
kWh
$11,370
942
kW-months/year
$6,900
27,610
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)