IAC logo
IAC Assessment: AM0736
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0736
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2017
Principal Product Custom molded plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 40,000
Annual Production 1,500,000 Units
Production Hrs. Annual 6,048
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,400 638,000 kWh $0.10
Electricity Demand $4,130 2,060 kW-months/year $2.00
Natural Gas $60,000 9,193 MMBtu $6.53
TOTAL ENERGY COSTS $126,530
RECOMMENDED SAVINGS* $21,027 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,497
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,040
Cost:
$14,990
$6,760 69,700 $280 138 - - $6,760
69,700
kWh
$280
138
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,030
Cost:
$9,000
$3,030 31,230 - - - - $3,030
31,230
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,590
Cost:
$6,390
$2,460 25,400 $130 64 - - $2,460
25,400
kWh
$130
64
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,710
Cost:
$400
$1,710 17,600 - - - - $1,710
17,600
kWh
-
-
kW-months/year
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,617
Cost:
-
- - - - $1,617 - -
-
kWh
-
-
kW-months/year
$1,617
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,600
Cost:
$300
$1,600 16,510 - - - - $1,600
16,510
kWh
-
-
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,550
Cost:
$2,000
$1,490 15,410 $60 31 - - $1,490
15,410
kWh
$60
31
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,390
Cost:
$390
$260 2,730 $10 4 $1,120 - $260
2,730
kWh
$10
4
kW-months/year
$1,120
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$500
Cost:
$20
$480 4,990 $20 10 - - $480
4,990
kWh
$20
10
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$21,027
Cost:
$33,490
$17,790 183,570 $500 247 $2,737 - $17,790
183,570
kWh
$500
247
kW-months/year
$2,737
-
$
TOTAL IMPLEMENTED Savings:
$17,497
Cost:
$24,470
$14,280 147,350 $480 237 $2,737 - $14,280
147,350
kWh
$480
237
kW-months/year
$2,737
-
$
Savings
Cost
$ kWh $ kW-months/year $ $