Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2018 |
Principal Product | Turkeys |
NAICS | 311615 - Poultry Processing |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 700 |
Plant Area (Sq.Ft.) | 330,000 |
Annual Production | 140,000,000 Pounds |
Production Hrs. Annual | 5,952 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,139,032 | 40,599,125 | kWh | $0.03 |
Electricity Demand | $551,697 | 76,577 | kW-months/year | $7.20 |
Electricity Fees | $34,250 | - | $ | - |
Natural Gas | $342,150 | 121,991 | MMBtu | $2.80 |
TOTAL ENERGY COSTS | $2,935,126 | |||
RECOMMENDED SAVINGS* | $274,420 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $99,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $170,240 Cost: $376,350 |
$126,600 | 4,219,900 | $43,640 | 5,780 |
$126,600 4,219,900 kWh |
$43,640 5,780 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $56,800 Cost: $121,500 |
$56,800 | 1,893,300 | - | - |
$56,800 1,893,300 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,900 Cost: $44,160 |
$19,800 | 661,200 | $10,100 | 1,333 |
$19,800 661,200 kWh |
$10,100 1,333 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $12,800 Cost: $39,100 |
- | - | $12,800 | 1,694 |
- - kWh |
$12,800 1,694 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,680 Cost: $30 |
$3,100 | 103,300 | $1,580 | 210 |
$3,100 103,300 kWh |
$1,580 210 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $274,420 Cost: $581,140 |
$206,300 | 6,877,700 | $68,120 | 9,017 | $206,300 6,877,700 kWh |
$68,120 9,017 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $99,500 Cost: $204,760 |
$76,600 | 2,554,500 | $22,900 | 3,027 | $76,600 2,554,500 kWh |
$22,900 3,027 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand |