IAC logo
IAC Assessment: AM0747
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0747
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2018
Principal Product Turkeys
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 330,000
Annual Production 140,000,000 Pounds
Production Hrs. Annual 5,952
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,139,032 40,599,125 kWh $0.03
Electricity Demand $551,697 76,577 kW-months/year $7.20
Electricity Fees $34,250 - $ -
Natural Gas $342,150 121,991 MMBtu $2.80
TOTAL ENERGY COSTS $2,935,126
RECOMMENDED SAVINGS* $274,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$170,240
Cost:
$376,350
$126,600 4,219,900 $43,640 5,780 $126,600
4,219,900
kWh
$43,640
5,780
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$56,800
Cost:
$121,500
$56,800 1,893,300 - - $56,800
1,893,300
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,900
Cost:
$44,160
$19,800 661,200 $10,100 1,333 $19,800
661,200
kWh
$10,100
1,333
kW-months/year
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,800
Cost:
$39,100
- - $12,800 1,694 -
-
kWh
$12,800
1,694
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,680
Cost:
$30
$3,100 103,300 $1,580 210 $3,100
103,300
kWh
$1,580
210
kW-months/year
TOTAL RECOMMENDED Savings:
$274,420
Cost:
$581,140
$206,300 6,877,700 $68,120 9,017 $206,300
6,877,700
kWh
$68,120
9,017
kW-months/year
TOTAL IMPLEMENTED Savings:
$99,500
Cost:
$204,760
$76,600 2,554,500 $22,900 3,027 $76,600
2,554,500
kWh
$22,900
3,027
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand