Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2019 |
Principal Product | Bronze valves and fittings |
NAICS | 332912 - Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492 - Fluid Power Valves & Hose Fittings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 4,032 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $433,348 | 13,073,422 | kWh | $0.03 |
Electricity Demand | $246,970 | 38,638 | kW-months/year | $6.39 |
Electricity Fees | $15,546 | - | $ | - |
Natural Gas | $61,667 | 12,440 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $885,531 | |||
RECOMMENDED SAVINGS* | $82,400 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,530 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $26,170 Cost: $10,000 |
$17,540 | 531,500 | $8,630 | 1,080 | - | - | - | - |
$17,540 531,500 kWh |
$8,630 1,080 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $20,800 Cost: $48,700 |
- | - | $20,800 | 2,601 | - | - | - | - |
- - kWh |
$20,800 2,601 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $17,710 Cost: $5,110 |
$(-1,060) | (-32,240) | $(-770) | (-96) | $19,540 | 111,670 | - | - |
$(-1,060) (-32,240) kWh |
$(-770) (-96) kW-months/year |
$19,540 111,670 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,360 Cost: $32,745 |
$8,285 | 251,000 | $4,075 | 510 | - | - | - | - |
$8,285 251,000 kWh |
$4,075 510 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,840 Cost: $12 |
$2,460 | 74,540 | $1,380 | 173 | - | - | - | - |
$2,460 74,540 kWh |
$1,380 173 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED |
Savings: $1,520 Cost: - |
- | - | - | - | - | - | $1,520 | - |
- - kWh |
- - kW-months/year |
- - lb |
$1,520 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,400 Cost: $96,567 |
$27,225 | 824,800 | $34,115 | 4,268 | $19,540 | 111,670 | $1,520 | - | $27,225 824,800 kWh |
$34,115 4,268 kW-months/year |
$19,540 111,670 lb |
$1,520 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,530 Cost: $42,745 |
$25,825 | 782,500 | $12,705 | 1,590 | - | - | - | - | $25,825 782,500 kWh |
$12,705 1,590 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |