Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2019 |
Principal Product | Intermediate bulk containers |
NAICS | 332313 - Plate Work Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 195,000 |
Annual Production | 10,650 Units |
Production Hrs. Annual | 2,416 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $54,221 | 1,437,089 | kWh | $0.04 |
Electricity Demand | $48,094 | 5,773 | kW-months/year | $8.33 |
Electricity Fees | $4,082 | - | $ | - |
Natural Gas | $26,060 | 3,098 | MMBtu | $8.41 |
TOTAL ENERGY COSTS | $177,142 | |||
RECOMMENDED SAVINGS* | $39,777 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,858 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $17,060 Cost: $25,000 |
- | - | - | - | - | - | $(-14,220) | (-1,706) | $31,280 | 284,358 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$(-14,220) (-1,706) MMBtu |
$31,280 284,358 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,552 Cost: $12,220 |
$6,170 | 166,757 | $5,382 | 853 | - | - | - | - | - | - | - | - |
$6,170 166,757 kWh |
$5,382 853 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,768 Cost: $1,000 |
$859 | 23,223 | $909 | 144 | - | - | - | - | - | - | - | - |
$859 23,223 kWh |
$909 144 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13 Cost: $10 |
$13 | 346 | - | - | - | - | - | - | - | - | - | - |
$13 346 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,077 Cost: $480 |
$140 | 3,784 | $38 | 6 | - | - | - | - | - | - | $899 | - |
$140 3,784 kWh |
$38 6 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
$899 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $92 Cost: $40 |
$34 | 910 | $58 | 9 | - | - | - | - | - | - | - | - |
$34 910 kWh |
$58 9 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $1,751 Cost: - |
- | - | - | - | $1,751 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,751 - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $6,464 Cost: $18,747 |
- | - | $6,464 | 1,024 | - | - | - | - | - | - | - | - |
- - kWh |
$6,464 1,024 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,777 Cost: $57,497 |
$7,216 | 195,020 | $12,851 | 2,036 | $1,751 | - | $(-14,220) | (-1,706) | $31,280 | 284,358 | $899 | - | $7,216 195,020 kWh |
$12,851 2,036 kW-months/year |
$1,751 - $ |
$(-14,220) (-1,706) MMBtu |
$31,280 284,358 Tgal |
$899 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,858 Cost: $1,490 |
$1,012 | 27,353 | $947 | 150 | - | - | - | - | - | - | $899 | - | $1,012 27,353 kWh |
$947 150 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
$899 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes |