IAC Assessment: AM0774
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2019
Principal Product roofing shingles, asphalt products
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 216
Plant Area (Sq.Ft.) 233,000
Annual Production 220,000,000 Tons
Production Hrs. Annual 6,624
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $581,692 18,384,836 kWh $0.03
Electricity Demand $336,613 37,819 kW-months/year $8.90
Electricity Fees $30,710 - $ -
Natural Gas $888,279 264,697 MMBtu $3.36
TOTAL ENERGY COSTS $1,971,244
RECOMMENDED SAVINGS* $630,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$200,328
Cost:
$100
- - - - $200,328 - - - -
-
kWh
-
-
kW-months/year
$200,328
-
$
-
-
lb
02: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$180,556
Cost:
$1,134,251
$180,556 6,613,800 - - - - - - $180,556
6,613,800
kWh
-
-
kW-months/year
-
-
$
-
-
lb
03: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$133,950
Cost:
$353,500
- - - - - - $133,950 1,140,000 -
-
kWh
-
-
kW-months/year
-
-
$
$133,950
1,140,000
lb
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$48,197
Cost:
$757,373
$48,197 1,292,134 - - - - - - $48,197
1,292,134
kWh
-
-
kW-months/year
-
-
$
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$41,452
Cost:
$72,710
- - $41,452 5,234 - - - - -
-
kWh
$41,452
5,234
kW-months/year
-
-
$
-
-
lb
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,150
Cost:
$36,000
$10,220 270,084 $3,930 497 - - - - $10,220
270,084
kWh
$3,930
497
kW-months/year
-
-
$
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,577
Cost:
$17,085
$6,932 185,855 $2,645 334 - - - - $6,932
185,855
kWh
$2,645
334
kW-months/year
-
-
$
-
-
lb
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,349
Cost:
$1,600
$1,328 35,592 $1,021 129 - - - - $1,328
35,592
kWh
$1,021
129
kW-months/year
-
-
$
-
-
lb
TOTAL RECOMMENDED Savings:
$630,559
Cost:
$2,372,619
$247,233 8,397,465 $49,048 6,194 $200,328 - $133,950 1,140,000 $247,233
8,397,465
kWh
$49,048
6,194
kW-months/year
$200,328
-
$
$133,950
1,140,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)