Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2019 |
Principal Product | Motors and control systems |
NAICS | 335312 - Motor and Generator Manufacturing |
SIC | 3621 - Motors And Generators |
Sales | $100,000,000-$500,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 481,000 |
Annual Production | 325 Pieces |
Production Hrs. Annual | 4,416 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $638,547 | 15,467,372 | kWh | $0.04 |
Electricity Demand | $261,017 | 35,467 | kW-months/year | $7.36 |
Electricity Fees | $20,337 | - | $ | - |
Natural Gas | $21,616 | 6,511 | MMBtu | $3.32 |
TOTAL ENERGY COSTS | $944,017 | |||
RECOMMENDED SAVINGS* | $24,818 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,460 Cost: $16,000 |
$4,870 | 118,700 | $2,590 | 325 | - | - |
$4,870 118,700 kWh |
$2,590 325 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,000 Cost: $8,765 |
$3,240 | 79,000 | $1,760 | 221 | - | - |
$3,240 79,000 kWh |
$1,760 221 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,160 Cost: - |
$692 | 16,884 | $2,468 | 306 | - | - |
$692 16,884 kWh |
$2,468 306 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $3,033 Cost: - |
$1,976 | 48,190 | $1,057 | 131 | - | - |
$1,976 48,190 kWh |
$1,057 131 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,795 Cost: $1,000 |
$1,830 | 44,600 | $965 | 121 | - | - |
$1,830 44,600 kWh |
$965 121 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,880 Cost: $6,600 |
$(-380) | (-9,340) | - | - | $2,260 | 3,890 |
$(-380) (-9,340) kWh |
- - kW-months/year |
$2,260 3,890 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,380 Cost: $3,300 |
$900 | 22,050 | $480 | 60 | - | - |
$900 22,050 kWh |
$480 60 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $110 Cost: $240 |
$110 | 2,680 | - | - | - | - |
$110 2,680 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,818 Cost: $35,905 |
$13,238 | 322,764 | $9,320 | 1,164 | $2,260 | 3,890 | $13,238 322,764 kWh |
$9,320 1,164 kW-months/year |
$2,260 3,890 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,635 Cost: $20,300 |
$7,600 | 185,350 | $4,035 | 506 | - | - | $7,600 185,350 kWh |
$4,035 506 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |