IAC logo
IAC Assessment: AM0785
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0785
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2019
Principal Product Building fasteners and closures
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $50,000,000-$100,000,000
# of Employees 165
Plant Area (Sq.Ft.) 205,000
Annual Production 9,600,000,000 Pieces
Production Hrs. Annual 3,980
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,202 7,383,130 kWh $0.04
Electricity Demand $240,365 27,699 kW-months/year $8.68
Electricity Fees $47,840 - $ -
Natural Gas $10,765 1,486 MMBtu $7.24
TOTAL ENERGY COSTS $674,172
RECOMMENDED SAVINGS* $45,845 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,635
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$19,800
Cost:
$750
- - - - $19,800 360 - - -
-
kWh
-
-
kW-months/year
$19,800
360
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,450
Cost:
$18,920
$4,900 132,500 $3,550 410 - - - - $4,900
132,500
kWh
$3,550
410
kW-months/year
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,880
Cost:
$2,000
$4,620 124,900 $3,260 376 - - - - $4,620
124,900
kWh
$3,260
376
kW-months/year
-
-
gal
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,685
Cost:
$6,865
- - $4,685 540 - - - - -
-
kWh
$4,685
540
kW-months/year
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,470
Cost:
$460
$210 5,710 $60 7 - - $1,200 - $210
5,710
kWh
$60
7
kW-months/year
-
-
gal
$1,200
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,340
Cost:
$5,250
- - $1,340 154 - - - - -
-
kWh
$1,340
154
kW-months/year
-
-
gal
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,160
Cost:
$650
$1,160 31,200 - - - - - - $1,160
31,200
kWh
-
-
kW-months/year
-
-
gal
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$620
Cost:
$20
$380 10,300 $240 28 - - - - $380
10,300
kWh
$240
28
kW-months/year
-
-
gal
-
-
$
09: 2.7145 INSTALL SKYLIGHTS Savings:
$440
Cost:
-
$1,160 31,300 - - - - $(-720) - $1,160
31,300
kWh
-
-
kW-months/year
-
-
gal
$(-720)
-
$
TOTAL RECOMMENDED Savings:
$45,845
Cost:
$34,915
$12,430 335,910 $13,135 1,515 $19,800 360 $480 - $12,430
335,910
kWh
$13,135
1,515
kW-months/year
$19,800
360
gal
$480
-
$
TOTAL IMPLEMENTED Savings:
$21,635
Cost:
$27,805
$9,900 267,700 $11,735 1,354 - - - - $9,900
267,700
kWh
$11,735
1,354
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes