IAC Assessment: AM0786
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0786
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2019
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4953 - Refuse Systems
Sales <$500,000
# of Employees 25
Plant Area (Sq.Ft.) 61,600
Annual Production 700,800 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,835 1,975,388 kWh $0.05
Electricity Demand $39,635 4,840 kW-months/year $8.19
Electricity Fees $5,177 - $ -
TOTAL ENERGY COSTS $144,647
RECOMMENDED SAVINGS* $80,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,920
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$55,800
Cost:
$67,044
$42,400 839,368 $13,400 1,632 - - $42,400
839,368
kWh
$13,400
1,632
kW-months/year
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,700
Cost:
$15,300
- - $11,700 1,429 - - -
-
kWh
$11,700
1,429
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,750
Cost:
$22,600
$9,750 195,000 - - - - $9,750
195,000
kWh
-
-
kW-months/year
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$2,760
Cost:
$4,570
$1,930 38,664 $390 47 $440 - $1,930
38,664
kWh
$390
47
kW-months/year
$440
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$910
Cost:
$290
$760 15,274 $150 18 - - $760
15,274
kWh
$150
18
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$80,920
Cost:
$109,804
$54,840 1,088,306 $25,640 3,126 $440 - $54,840
1,088,306
kWh
$25,640
3,126
kW-months/year
$440
-
$
TOTAL IMPLEMENTED Savings:
$80,920
Cost:
$109,804
$54,840 1,088,306 $25,640 3,126 $440 - $54,840
1,088,306
kWh
$25,640
3,126
kW-months/year
$440
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes