Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2019 |
Principal Product | Wastewater Treatment |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4953 - Refuse Systems |
Sales | <$500,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 61,600 |
Annual Production | 700,800 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $99,835 | 1,975,388 | kWh | $0.05 |
Electricity Demand | $39,635 | 4,840 | kW-months/year | $8.19 |
Electricity Fees | $5,177 | - | $ | - |
TOTAL ENERGY COSTS | $144,647 | |||
RECOMMENDED SAVINGS* | $80,920 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $80,920 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $55,800 Cost: $67,044 |
$42,400 | 839,368 | $13,400 | 1,632 | - | - |
$42,400 839,368 kWh |
$13,400 1,632 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,700 Cost: $15,300 |
- | - | $11,700 | 1,429 | - | - |
- - kWh |
$11,700 1,429 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,750 Cost: $22,600 |
$9,750 | 195,000 | - | - | - | - |
$9,750 195,000 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $2,760 Cost: $4,570 |
$1,930 | 38,664 | $390 | 47 | $440 | - |
$1,930 38,664 kWh |
$390 47 kW-months/year |
$440 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $910 Cost: $290 |
$760 | 15,274 | $150 | 18 | - | - |
$760 15,274 kWh |
$150 18 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,920 Cost: $109,804 |
$54,840 | 1,088,306 | $25,640 | 3,126 | $440 | - | $54,840 1,088,306 kWh |
$25,640 3,126 kW-months/year |
$440 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $80,920 Cost: $109,804 |
$54,840 | 1,088,306 | $25,640 | 3,126 | $440 | - | $54,840 1,088,306 kWh |
$25,640 3,126 kW-months/year |
$440 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |