IAC Assessment: AM0787
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0787
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2019
Principal Product Clay coated and chip paperboard
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 170,000
Annual Production 124,000 Units
Production Hrs. Annual 8,712
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,338,100 55,519,380 kWh $0.04
Electricity Demand $735,222 97,780 kW-months/year $7.52
Electricity Fees $3,140,978 - $ -
Natural Gas $1,927,192 1,280,254 MMBtu $1.51
TOTAL ENERGY COSTS $8,141,493
RECOMMENDED SAVINGS* $747,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $144,579
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$290,927
Cost:
$1,011,274
$290,927 8,241,552 - - - - $290,927
8,241,552
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$312,044
Cost:
$849,614
$312,044 6,915,582 - - - - $312,044
6,915,582
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$56,595
Cost:
$10,440
- - - - $56,595 37,730 -
-
kWh
-
-
kW-months/year
$56,595
37,730
MMBtu
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$13,271
Cost:
$14,560
$10,525 250,589 $2,746 345 - - $10,525
250,589
kWh
$2,746
345
kW-months/year
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$70,814
Cost:
$178,864
- - $70,814 8,895 - - -
-
kWh
$70,814
8,895
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,322
Cost:
$825
$2,322 55,287 - - - - $2,322
55,287
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,577
Cost:
$2,640
$1,036 24,672 $541 68 - - $1,036
24,672
kWh
$541
68
kW-months/year
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$399
Cost:
$280
$264 6,284 $135 17 - - $264
6,284
kWh
$135
17
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$747,949
Cost:
$2,068,497
$617,118 15,493,966 $74,236 9,325 $56,595 37,730 $617,118
15,493,966
kWh
$74,236
9,325
kW-months/year
$56,595
37,730
MMBtu
TOTAL IMPLEMENTED Savings:
$144,579
Cost:
$207,329
$13,883 330,548 $74,101 9,308 $56,595 37,730 $13,883
330,548
kWh
$74,101
9,308
kW-months/year
$56,595
37,730
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas