Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2019 |
Principal Product | Butt weld pipe fittings |
NAICS | 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 67 |
Plant Area (Sq.Ft.) | 93,648 |
Annual Production | 4,000 Pieces |
Production Hrs. Annual | 4,560 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $139,746 | 3,196,984 | kWh | $0.04 |
Electricity Demand | $80,577 | 20,695 | kW-months/year | $3.89 |
Electricity Fees | $6,952 | - | $ | - |
Natural Gas | $218,043 | 52,802 | MMBtu | $4.13 |
TOTAL ENERGY COSTS | $445,318 | |||
RECOMMENDED SAVINGS* | $60,930 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,640 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $28,740 Cost: $46,480 |
$20,300 | 461,800 | $9,000 | 1,445 | $(-560) | - |
$20,300 461,800 kWh |
$9,000 1,445 kW-months/year |
$(-560) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $15,300 Cost: $53,500 |
- | - | $15,300 | 2,483 | - | - |
- - kWh |
$15,300 2,483 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,100 Cost: $2,000 |
$5,000 | 114,000 | $2,100 | 340 | - | - |
$5,000 114,000 kWh |
$2,100 340 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7145 INSTALL SKYLIGHTS |
Savings: $4,290 Cost: $7,120 |
$4,290 | 97,500 | - | - | - | - |
$4,290 97,500 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $3,600 Cost: - |
$3,600 | 82,200 | - | - | - | - |
$3,600 82,200 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,900 Cost: $1,620 |
$1,900 | 43,500 | - | - | - | - |
$1,900 43,500 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,930 Cost: $110,720 |
$35,090 | 799,000 | $26,400 | 4,268 | $(-560) | - | $35,090 799,000 kWh |
$26,400 4,268 kW-months/year |
$(-560) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,640 Cost: $103,600 |
$30,800 | 701,500 | $26,400 | 4,268 | $(-560) | - | $30,800 701,500 kWh |
$26,400 4,268 kW-months/year |
$(-560) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost |