IAC logo
IAC Assessment: AM0807
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0807
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2020
Principal Product High density polyethylene plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 157,000
Annual Production 250,526 Units
Production Hrs. Annual 8,640
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,449 3,759,324 kWh $0.07
Electricity Demand $73,143 9,450 kW-months/year $7.74
Electricity Fees $2,772 - $ -
TOTAL ENERGY COSTS $345,364
RECOMMENDED SAVINGS* $45,972 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,044
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,243
Cost:
$320
- - - - - - $12,243 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,243
-
$
-
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$10,390
Cost:
$800
$224 3,200 $16 2 $18,400 - - - $(-8,250) - $224
3,200
kWh
$16
2
kW-months/year
$18,400
-
$
-
-
$
$(-8,250)
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$9,795
Cost:
$2,700
$7,775 111,070 $2,020 260 - - - - - - $7,775
111,070
kWh
$2,020
260
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,453
Cost:
$1,000
$3,992 57,024 $613 79 $(-1,152) - - - - - $3,992
57,024
kWh
$613
79
kW-months/year
$(-1,152)
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,462
Cost:
$1,138
$3,462 49,460 - - - - - - - - $3,462
49,460
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,095
Cost:
$6,130
$1,453 16,911 $651 84 - - - - $(-9) - $1,453
16,911
kWh
$651
84
kW-months/year
-
-
$
-
-
$
$(-9)
-
$
07: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$1,430
Cost:
$4,570
$7,650 109,300 $1,300 170 $(-7,900) - $380 - - - $7,650
109,300
kWh
$1,300
170
kW-months/year
$(-7,900)
-
$
$380
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,500
Cost:
$16
$2,170 31,000 $330 43 - - - - - - $2,170
31,000
kWh
$330
43
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$604
Cost:
$1,239
$604 6,713 - - - - - - - - $604
6,713
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,972
Cost:
$17,913
$27,330 384,678 $4,930 638 $9,348 - $12,623 - $(-8,259) - $27,330
384,678
kWh
$4,930
638
kW-months/year
$9,348
-
$
$12,623
-
$
$(-8,259)
-
$
TOTAL IMPLEMENTED Savings:
$11,044
Cost:
$14,077
$17,161 239,408 $2,564 333 $(-9,052) - $380 - $(-9) - $17,161
239,408
kWh
$2,564
333
kW-months/year
$(-9,052)
-
$
$380
-
$
$(-9)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost