Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2020
Principal Product Wire rope and slings
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 90,000
Annual Production 30,000 Pieces
Production Hrs. Annual 2,750
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,141 792,960 kWh $0.04
Electricity Demand $19,297 3,442 kW-months/year $5.61
Electricity Fees $9,194 - $ -
TOTAL ENERGY COSTS $62,632
RECOMMENDED SAVINGS* $57,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$23,040
Cost:
$20,000
- - - - - - $23,040 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,040
-
$
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,170
Cost:
$12,500
- - $4,170 692 - - - - - - - - -
-
kWh
$4,170
692
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$19,400
Cost:
$3,000
- - - - $3,880 - - - - - $15,520 - -
-
kWh
-
-
kW-months/year
$3,880
-
$
-
-
$
-
-
$
$15,520
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$2,950
Cost:
$200
- - - - - - - - $2,950 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$2,950
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,690
Cost:
$8,520
$1,540 35,900 $1,120 196 - - - - $30 - - - $1,540
35,900
kWh
$1,120
196
kW-months/year
-
-
$
-
-
$
$30
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,950
Cost:
$2,820
$1,140 26,330 $520 90 - - - - $290 - - - $1,140
26,330
kWh
$520
90
kW-months/year
-
-
$
-
-
$
$290
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,720
Cost:
$800
$1,000 23,200 $720 126 - - - - - - - - $1,000
23,200
kWh
$720
126
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,210
Cost:
$140
$1,210 28,140 - - - - - - - - - - $1,210
28,140
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$340
Cost:
$10
$210 4,870 $130 22 - - - - - - - - $210
4,870
kWh
$130
22
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,470
Cost:
$47,990
$5,100 118,440 $6,660 1,126 $3,880 - $23,040 - $3,270 - $15,520 - $5,100
118,440
kWh
$6,660
1,126
kW-months/year
$3,880
-
$
$23,040
-
$
$3,270
-
$
$15,520
-
$
TOTAL IMPLEMENTED Savings:
$3,030
Cost:
$8,530
$1,750 40,770 $1,250 218 - - - - $30 - - - $1,750
40,770
kWh
$1,250
218
kW-months/year
-
-
$
-
-
$
$30
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost