IAC Assessment: AM0830
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0830
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2021
Principal Product Aerospace wiring systems harnesses
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 604
Plant Area (Sq.Ft.) 120,000
Annual Production 38,000 Pieces
Production Hrs. Annual 2,192
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,251 2,551,944 kWh $0.06
Electricity Demand $68,318 6,324 kW-months/year $10.80
Electricity Fees $851 - $ -
TOTAL ENERGY COSTS $217,532
RECOMMENDED SAVINGS* $22,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,950
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,150
Cost:
-
$11,800 226,300 - - $(-650) - - - $11,800
226,300
kWh
-
-
kW-months/year
$(-650)
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,020
Cost:
$16,040
- - $4,020 341 - - - - -
-
kWh
$4,020
341
kW-months/year
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,300
Cost:
$25
$1,770 34,000 $530 49 - - - - $1,770
34,000
kWh
$530
49
kW-months/year
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,760
Cost:
$460
$1,720 33,100 $1,040 96 - - - - $1,720
33,100
kWh
$1,040
96
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,740
Cost:
$1,170
$370 7,140 $110 10 $820 - $1,440 - $370
7,140
kWh
$110
10
kW-months/year
$820
-
$
$1,440
-
$
TOTAL RECOMMENDED Savings:
$22,970
Cost:
$17,695
$15,660 300,540 $5,700 496 $170 - $1,440 - $15,660
300,540
kWh
$5,700
496
kW-months/year
$170
-
$
$1,440
-
$
TOTAL IMPLEMENTED Savings:
$18,950
Cost:
$1,655
$15,660 300,540 $1,680 155 $170 - $1,440 - $15,660
300,540
kWh
$1,680
155
kW-months/year
$170
-
$
$1,440
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost