IAC logo
IAC Assessment: AM0836
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0836
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Sanitized water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 5
Plant Area (Sq.Ft.) 30,000
Annual Production 2,372,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,607 5,596,357 kWh $0.04
Electricity Demand $159,726 17,914 kW-months/year $8.92
Electricity Fees $4,473 - $ -
TOTAL ENERGY COSTS $363,806
RECOMMENDED SAVINGS* $22,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,197
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,100
Cost:
$11,315
- - $12,100 1,130 - - - - -
-
kWh
$12,100
1,130
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,240
Cost:
$8,070
- - $6,240 623 - - - - -
-
kWh
$6,240
623
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,850
Cost:
$890
$1,510 41,900 $340 59 - - - - $1,510
41,900
kWh
$340
59
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$1,270
Cost:
$2,420
$900 25,030 - - - - $370 - $900
25,030
kWh
-
-
kW-months/year
-
-
MMBtu
$370
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$570
Cost:
$1,820
- - $250 25 $320 8,800 - - -
-
kWh
$250
25
kW-months/year
$320
8,800
MMBtu
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$167
Cost:
$35
$110 3,075 $57 10 - - - - $110
3,075
kWh
$57
10
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,197
Cost:
$24,550
$2,520 70,005 $18,987 1,847 $320 8,800 $370 - $2,520
70,005
kWh
$18,987
1,847
kW-months/year
$320
8,800
MMBtu
$370
-
$
TOTAL IMPLEMENTED Savings:
$22,197
Cost:
$24,550
$2,520 70,005 $18,987 1,847 $320 8,800 $370 - $2,520
70,005
kWh
$18,987
1,847
kW-months/year
$320
8,800
MMBtu
$370
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost