IAC logo
IAC Assessment: AM0858
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0858
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product doctor visits
NAICS 621111 - Offices of Physicians (except Mental Health Specialists)
SIC 8011 - Offices & Clinics Of Medical Doctors
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 128,961
Annual Production 5,000 Pieces
Production Hrs. Annual 4,300
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,847 2,079,360 kWh $0.04
Electricity Demand $71,283 5,534 kW-months/year $12.88
TOTAL ENERGY COSTS $151,130
RECOMMENDED SAVINGS* $48,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,075
Cost:
$110,044
$16,005 416,798 $18,070 1,403 $16,005
416,798
kWh
$18,070
1,403
kW-months/year
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$8,689
Cost:
$45,000
$3,814 99,355 $4,875 379 $3,814
99,355
kWh
$4,875
379
kW-months/year
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,243
Cost:
$11,600
$1,529 39,809 $714 55 $1,529
39,809
kWh
$714
55
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,656
Cost:
$8,400
$1,656 43,133 - - $1,656
43,133
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,035
Cost:
$10,000
$2,035 52,997 - - $2,035
52,997
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$48,698
Cost:
$185,044
$25,039 652,092 $23,659 1,837 $25,039
652,092
kWh
$23,659
1,837
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year