IAC logo
IAC Assessment: AM0861
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0861
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2023
Principal Product Bread & rolls
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 147,000
Annual Production 68,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $370,541 6,959,009 kWh $0.05
Electricity Demand $116,329 14,325 kW-months/year $8.12
Electricity Fees $53,415 - $ -
Natural Gas $218,596 34,091 MMBtu $6.41
TOTAL ENERGY COSTS $758,881
RECOMMENDED SAVINGS* $278,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $260,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$238,650
Cost:
$7,000
- - - - $47,730 - - - $190,920 - -
-
kWh
-
-
kW-months/year
$47,730
-
$
-
-
$
$190,920
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,100
Cost:
$9,940
$12,330 216,400 $3,040 377 - - $(-270) - - - $12,330
216,400
kWh
$3,040
377
kW-months/year
-
-
$
$(-270)
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,300
Cost:
$41,680
- - $18,300 2,267 - - - - - - -
-
kWh
$18,300
2,267
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,960
Cost:
$460
$3,960 69,570 - - - - - - - - $3,960
69,570
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,870
Cost:
$13
$1,570 27,500 $300 37 - - - - - - $1,570
27,500
kWh
$300
37
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$700
Cost:
-
$570 9,930 $130 16 - - - - - - $570
9,930
kWh
$130
16
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$101
Cost:
$214
$101 1,770 - - - - - - - - $101
1,770
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$278,681
Cost:
$59,307
$18,531 325,170 $21,770 2,697 $47,730 - $(-270) - $190,920 - $18,531
325,170
kWh
$21,770
2,697
kW-months/year
$47,730
-
$
$(-270)
-
$
$190,920
-
$
TOTAL IMPLEMENTED Savings:
$260,280
Cost:
$17,413
$18,430 323,400 $3,470 430 $47,730 - $(-270) - $190,920 - $18,430
323,400
kWh
$3,470
430
kW-months/year
$47,730
-
$
$(-270)
-
$
$190,920
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost