Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2023 |
Principal Product | engineered polymers, gaskets |
NAICS | 326291 - Rubber Product Manufacturing for Mechanical Use |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 204,000 |
Annual Production | 5,000,000,000 Pieces |
Production Hrs. Annual | 8,472 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $443,358 | 9,574,000 | kWh | $0.05 |
Electricity Demand | $184,037 | 20,521 | kW-months/year | $8.97 |
Electricity Fees | $14,634 | - | $ | - |
Natural Gas | $464,306 | 77,897 | MMBtu | $5.96 |
TOTAL ENERGY COSTS | $1,106,335 | |||
RECOMMENDED SAVINGS* | $139,599 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $131,299 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $80,175 Cost: $8,170 |
- | - | - | - | $80,175 | 14,765 | - | - | - | - |
- - kWh |
- - kW-months/year |
$80,175 14,765 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $27,516 Cost: $41,926 |
- | - | $27,516 | 3,109 | - | - | - | - | - | - |
- - kWh |
$27,516 3,109 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $18,325 Cost: $6,300 |
- | - | - | - | $18,325 | 3,375 | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,325 3,375 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,300 Cost: $9,000 |
$8,300 | 180,400 | - | - | - | - | - | - | - | - |
$8,300 180,400 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,080 Cost: $16,563 |
$3,788 | 82,355 | $1,044 | 118 | - | - | - | - | $(-752) | - |
$3,788 82,355 kWh |
$1,044 118 kW-months/year |
- - MMBtu |
- - Tgal |
$(-752) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $1,203 Cost: $4,750 |
- | - | - | - | $1,010 | 186 | $193 | 55 | - | - |
- - kWh |
- - kW-months/year |
$1,010 186 MMBtu |
$193 55 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $139,599 Cost: $86,709 |
$12,088 | 262,755 | $28,560 | 3,227 | $99,510 | 18,326 | $193 | 55 | $(-752) | - | $12,088 262,755 kWh |
$28,560 3,227 kW-months/year |
$99,510 18,326 MMBtu |
$193 55 Tgal |
$(-752) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $131,299 Cost: $77,709 |
$3,788 | 82,355 | $28,560 | 3,227 | $99,510 | 18,326 | $193 | 55 | $(-752) | - | $3,788 82,355 kWh |
$28,560 3,227 kW-months/year |
$99,510 18,326 MMBtu |
$193 55 Tgal |
$(-752) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Ancillary Material Cost |