Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2023 |
Principal Product | Storage tank terminal facility |
NAICS | 493190 - Other Warehousing and Storage |
SIC | 4226 - Special Warehousing And Storage, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 4,000,000 |
Annual Production | 1 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $654,368 | 13,718,120 | kWh | $0.05 |
Electricity Demand | $274,057 | 51,129 | kW-months/year | $5.36 |
Electricity Fees | $75,306 | - | $ | - |
Natural Gas | $3,136,415 | 456,405 | MMBtu | $6.87 |
TOTAL ENERGY COSTS | $4,140,146 | |||
RECOMMENDED SAVINGS* | $756,810 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $263,000 |
#|Description |
Savings Cost |
Status | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $259,000 Cost: $25,200 |
- | - | $259,000 | 37,700 | - | - | - | - |
- - kW-months/year |
$259,000 37,700 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $263,000 Cost: $452,400 |
- | - | - | - | - | - | $263,000 | - |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$263,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $109,400 Cost: $10,100 |
- | - | $109,400 | 15,920 | - | - | - | - |
- - kW-months/year |
$109,400 15,920 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $67,910 Cost: $12,000 |
- | - | $63,790 | 9,290 | $4,120 | 3,690 | - | - |
- - kW-months/year |
$63,790 9,290 MMBtu |
$4,120 3,690 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $34,000 Cost: $10,000 |
$34,000 | 6,344 | - | - | - | - | - | - |
$34,000 6,344 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $23,500 Cost: $87,830 |
$23,500 | 4,387 | - | - | - | - | - | - |
$23,500 4,387 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $756,810 Cost: $597,530 |
$57,500 | 10,731 | $432,190 | 62,910 | $4,120 | 3,690 | $263,000 | - | $57,500 10,731 kW-months/year |
$432,190 62,910 MMBtu |
$4,120 3,690 Tgal |
$263,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $263,000 Cost: $452,400 |
- | - | - | - | - | - | $263,000 | - | - - kW-months/year |
- - MMBtu |
- - Tgal |
$263,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Demand | Natural Gas | Water Usage | Primary Raw Material | Electricity Demand | Natural Gas | Water Usage | Primary Raw Material |