IAC Assessment: AM0867
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0867
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2023
Principal Product Storage tank terminal facility
NAICS 493190 - Other Warehousing and Storage
SIC 4226 - Special Warehousing And Storage, Nec
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 4,000,000
Annual Production 1 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $654,368 13,718,120 kWh $0.05
Electricity Demand $274,057 51,129 kW-months/year $5.36
Electricity Fees $75,306 - $ -
Natural Gas $3,136,415 456,405 MMBtu $6.87
TOTAL ENERGY COSTS $4,140,146
RECOMMENDED SAVINGS* $756,810 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $263,000
#|Description Savings
Cost
Status Electricity Demand Natural Gas Water Usage Primary Raw Material Electricity Demand Natural Gas Water Usage Primary Raw Material
$ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$259,000
Cost:
$25,200
- - $259,000 37,700 - - - - -
-
kW-months/year
$259,000
37,700
MMBtu
-
-
Tgal
-
-
$
02: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$263,000
Cost:
$452,400
- - - - - - $263,000 - -
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$263,000
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$109,400
Cost:
$10,100
- - $109,400 15,920 - - - - -
-
kW-months/year
$109,400
15,920
MMBtu
-
-
Tgal
-
-
$
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$67,910
Cost:
$12,000
- - $63,790 9,290 $4,120 3,690 - - -
-
kW-months/year
$63,790
9,290
MMBtu
$4,120
3,690
Tgal
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$34,000
Cost:
$10,000
$34,000 6,344 - - - - - - $34,000
6,344
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,500
Cost:
$87,830
$23,500 4,387 - - - - - - $23,500
4,387
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$756,810
Cost:
$597,530
$57,500 10,731 $432,190 62,910 $4,120 3,690 $263,000 - $57,500
10,731
kW-months/year
$432,190
62,910
MMBtu
$4,120
3,690
Tgal
$263,000
-
$
TOTAL IMPLEMENTED Savings:
$263,000
Cost:
$452,400
- - - - - - $263,000 - -
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$263,000
-
$
Savings
Cost
$ kW-months/year $ MMBtu $ Tgal $ $
Electricity Demand Natural Gas Water Usage Primary Raw Material Electricity Demand Natural Gas Water Usage Primary Raw Material