IAC logo
IAC Assessment: AM0891
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0891
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product fiberglass underground storage tanks
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 50,000
Annual Production 750 Pieces
Production Hrs. Annual 6,498
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,518 1,479,120 kWh $0.06
Electricity Demand $25,941 3,847 kW-months/year $6.74
Electricity Fees $24,719 - $ -
Natural Gas $39,589 3,669 MMBtu $10.79
TOTAL ENERGY COSTS $185,767
RECOMMENDED SAVINGS* $60,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$47,100
Cost:
$10,000
- - - - $9,420 - $37,680 - -
-
kWh
-
-
kW-months/year
$9,420
-
$
$37,680
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,700
Cost:
$1,000
$5,500 85,200 $1,200 157 - - - - $5,500
85,200
kWh
$1,200
157
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,490
Cost:
$4,220
$2,860 44,310 $630 82 - - - - $2,860
44,310
kWh
$630
82
kW-months/year
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,710
Cost:
$7,275
- - $2,710 352 - - - - -
-
kWh
$2,710
352
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$525
Cost:
$390
$525 8,140 - - - - - - $525
8,140
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$340
Cost:
$980
$280 4,270 $60 8 - - - - $280
4,270
kWh
$60
8
kW-months/year
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$47
Cost:
$165
$35 548 $12 2 - - - - $35
548
kWh
$12
2
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,912
Cost:
$24,030
$9,200 142,468 $4,612 601 $9,420 - $37,680 - $9,200
142,468
kWh
$4,612
601
kW-months/year
$9,420
-
$
$37,680
-
$
TOTAL IMPLEMENTED Savings:
$60,047
Cost:
$22,660
$8,395 130,058 $4,552 593 $9,420 - $37,680 - $8,395
130,058
kWh
$4,552
593
kW-months/year
$9,420
-
$
$37,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost