IAC Assessment: AM0909
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0909
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product Commercial grade fountain equipment
NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 60,000
Annual Production 7,000 Units
Production Hrs. Annual 2,241
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,639 738,033 kWh $0.08
Electricity Demand $12,086 2,417 kW-months/year $5.00
Electricity Fees $8,220 - $ -
Other Gas $29,175 1,011 MMBtu $28.86
TOTAL ENERGY COSTS $107,120
RECOMMENDED SAVINGS* $54,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$30,000
Cost:
$10,000
- - - - $6,000 - - - - - $24,000 - -
-
kWh
-
-
kW-months/year
$6,000
-
$
-
-
MMBtu
-
-
$
$24,000
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$16,800
Cost:
$21,600
- - - - - - $16,800 583 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,800
583
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,600
Cost:
$8,190
$2,500 32,500 $850 170 - - - - $250 - - - $2,500
32,500
kWh
$850
170
kW-months/year
-
-
$
-
-
MMBtu
$250
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,170
Cost:
$550
$1,600 21,300 $570 114 - - - - - - - - $1,600
21,300
kWh
$570
114
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,070
Cost:
$2,100
$1,070 13,700 - - - - - - - - - - $1,070
13,700
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$385
Cost:
$680
$330 4,200 $55 11 - - - - - - - - $330
4,200
kWh
$55
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$360
Cost:
$970
$360 4,600 - - - - - - - - - - $360
4,600
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$54,385
Cost:
$44,090
$5,860 76,300 $1,475 295 $6,000 - $16,800 583 $250 - $24,000 - $5,860
76,300
kWh
$1,475
295
kW-months/year
$6,000
-
$
$16,800
583
MMBtu
$250
-
$
$24,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost